N84 Grid

BARCALDINE (hydro)

Developer as published, connection site, reference: BARCALDINE. SSEN-50KW-7f0c52bb132c. Not in the latest file

Sign in to watch this project
Capacity0 MWHydro and pumped storage
Connection datenot statedStatus as printed: Accepted to Connect
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

No date history to draw

The files N84 holds in your history window print no connection date for this project.

Observed changes

N84 holds 39 editions of the SSEN Embedded Capacity Register back to 1 Aug 2023. No change for this record is older than 30 days.

Showing changes in files dated from 23 Sep 2026.

  1. 1 Oct 2026. Not printed in this file; printed in the previous one. Between the files dated 1 Sep 2026 and 1 Oct 2026.present → missingReceipt: SSEN Embedded Capacity Register, file dated 1 Oct 2026Receipt: SSEN Embedded Capacity Register, file dated 1 Sep 2026, row 1178

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.