DRAYTON (solar, 40 MW)

Developer as published, connection site, reference: DRAYTON. SSEN-1MW-b6f3b8f0ecb9-2.

Sign in to watch this project
Capacity40 MWSolar
Connection date25 Jan 2027Status as printed: Accepted to Connect
MW ahead in N84's order at this site24.05 MWcalculated by N84

Connection date, edition by edition

20272028File dated 2024-04-01: connection date 2027-01-25Jan 2027File dated 2026-10-01: connection date 2027-01-251 Apr20241 Oct2026
20272028File dated 2024-04-01: connection date 2027-01-25Jan 2027File dated 2026-10-01: connection date 2027-01-251 Apr20241 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 1 Apr 2024 to 1 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.