N84 Grid

Bainsford 132/33kV

NESO connection site, host SPT.

Contracted here0.04 GWNot yet connected, as printed
Entries in the queue1entry with a printed MW
Earliest connection date24 Nov 2025Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue43 MW across the first project
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

  • Bankside BESS31 May 2024 to 24 Nov 2025, date already passed (gate 2)
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Bankside BESS31 May 202424 Nov 202543 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW25 MW50 MW2025: 43 MW202543 MW
0 MW25 MW50 MW2025: 43 MW202543 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202543 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Bankside BESS43 MW0 MW24 Nov 20252gate 2Under Construction/Commissioning

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2025143 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Bankside BESSBattery storage43 MW24 Nov 2025Under Construction/Commissioning
Caledon Green Gas GenerationGas22.5 MWnot statedBuilt
Abbotshaugh Reserve Power FacilityGas20 MWnot statedBuilt

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.