N84 Grid

Bathgate 132/33kV

NESO connection site, host SPT.

Contracted here0.08 GWNot yet connected, as printed
Entries in the queue7entries with a printed MW
Earliest connection date30 Nov 2022Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue64.2 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Easter Drumclair Generator7 Nov 202530 Nov 20226 MW
Torrance Farm Extension 27 Nov 202530 Sep 202521.6 MW
Southrigg 2 Wind Farm7 Nov 202531 Oct 20258.4 MW
Heights Wind Farm7 Nov 202530 Sep 20269.8 MW
Tormywheel Extension WF7 Nov 202529 Oct 20269.4 MW
Forrestfield Wind Farm7 Nov 202529 Nov 20269 MW
Woolfords Wind Farm7 Nov 202529 Aug 203119.8 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW50 MW100 MW2022: 6 MW2025: 36 MW2026: 64 MW2031: 84 MW20222024202620282030203184 MW
0 MW50 MW100 MW2022: 6 MW2025: 36 MW2026: 64 MW2031: 84 MW202220252028203184 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20226 MW
202536 MW
202664.2 MW
203184 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Easter Drumclair Generator6 MW0 MW30 Nov 2022not statedgate not printedAwaiting Consents
2Torrance Farm Extension 221.6 MW6 MW30 Sep 2025not statedgate not printedScoping
3Southrigg 2 Wind Farm8.4 MW27.6 MW31 Oct 2025not statedgate not printedScoping
4Heights Wind Farm9.8 MW36 MW30 Sep 2026not statedgate not printedScoping
5Tormywheel Extension WF9.4 MW45.8 MW29 Oct 2026not statedgate not printedScoping
6Forrestfield Wind Farm9 MW55.2 MW29 Nov 2026not statedgate not printedAwaiting Consents
7Woolfords Wind Farm19.8 MW64.2 MW29 Aug 2031not statedgate not printedScoping

Receipt: MW and dates as printed in the NESO Embedded Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202216 MW
2025230 MW
2026328.2 MW
2031119.8 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
TormywheelOnshore wind37.45 MWnot statedBuilt
Burnhead Wind FarmOnshore wind29.5 MWnot statedBuilt
Torrance Farm Extension 2Onshore wind21.6 MW30 Sep 2025Scoping
Woolfords Wind FarmOnshore wind19.8 MW29 Aug 2031Scoping
Heights Wind FarmOnshore wind9.8 MW30 Sep 2026Scoping
Tormywheel Extension WFOnshore wind9.4 MW29 Oct 2026Scoping
Forrestfield Wind FarmOnshore wind9 MW29 Nov 2026Awaiting Consents
Torrance Warm Wind FarmOnshore wind9 MWnot statedBuilt
Southrigg 2 Wind FarmOnshore wind8.4 MW31 Oct 2025Scoping
Easter Drumclair GeneratorOnshore wind6 MW30 Nov 2022Awaiting Consents
Drumduff Wind FarmOnshore wind6 MWnot statedBuilt
Torrance Wind Farm ExtensionOnshore wind6 MWnot statedBuilt

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.