Bonnybridge 132/33kV

NESO connection site, host SPT.

Contracted here0.09 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date1 Oct 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue90 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Drummarnock Wind Farm31 May 20241 Oct 202630 MW
Scottish Water Bonnybridge STW 60MW BESS21 Mar 202531 Oct 203060 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW50 MW100 MW2026: 30 MW2030: 90 MW2026202720282029203090 MW
0 MW50 MW100 MW2026: 30 MW2030: 90 MW20262028203090 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202630 MW
203090 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Drummarnock Wind Farm30 MW0 MW1 Oct 2026not statedgate not printedScoping
2Scottish Water Bonnybridge STW 60MW BESS60 MW30 MW31 Oct 20301gate 1Scoping

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2026130 MW
2030160 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Scottish Water Bonnybridge STW 60MW BESSBattery storage60 MW31 Oct 2030Scoping
EarlsburnOnshore wind35 MWnot statedBuilt
Drummarnock Wind FarmOnshore wind30 MW1 Oct 2026Scoping
CarmuirsGas19.9 MWnot statedBuilt
Tod HillOnshore wind12 MWnot statedBuilt
Craigannet Wind TurbineOnshore wind1.5 MWnot statedBuilt

Supported by National Energy SO Open Data