N84 Grid

Burghmuir 2 400/33kV GSP

NESO connection site, host SHET.

Contracted here0.10 GWNot yet connected, as printed
Entries in the queue3entries with a printed MW
Earliest connection date30 Sep 2024Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue101.64 MW across the first 3 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Burghmuir GSP7 Nov 202530 Sep 20241.24 MW
Balgowan Solar and BESS7 Nov 202531 Oct 203349.9 MW
Burghmuir BESS7 Nov 202531 Oct 203350.5 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW100 MW200 MW2024: 1 MW2033: 102 MW202420262028203020322033102 MW
0 MW100 MW200 MW2024: 1 MW2033: 102 MW2024202720302033102 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20241.24 MW
2033101.64 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Burghmuir GSP1.24 MW0 MW30 Sep 2024not statedgate not printedScoping
2Balgowan Solar and BESS49.9 MW1.24 MW31 Oct 20331gate 1Scoping
3Burghmuir BESS50.5 MW51.14 MW31 Oct 20331gate 1Scoping

Receipt: MW and dates as printed in the NESO Embedded Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202411.24 MW
20332100.4 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Burghmuir BESSBattery storage50.5 MW31 Oct 2033Scoping
Balgowan Solar and BESSHybrid49.9 MW31 Oct 2033Scoping
Burghmuir GSP (Scottish Hydro Electric Power Distribution Plc)Hybrid1.24 MW30 Sep 2024Scoping

Supported by National Energy SO Open Data