N84 Grid

Clachan GSP

NESO connection site, host SHET.

Contracted here0.00 GWNot yet connected, as printed
Entries in the queue1entry with a printed MW
Earliest connection date30 Sep 2025Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue0.42 MW across the first project
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

  • Clachan GSP7 Nov 2025 to 30 Sep 2025, date already passed (gate not printed)
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Clachan GSP7 Nov 202530 Sep 20250.42 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW0 MW1 MW2025: 0 MW20250 MW
0 MW0 MW1 MW2025: 0 MW20250 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20250.42 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Clachan GSP0.42 MW0 MW30 Sep 2025not statedgate not printedScoping

Receipt: MW and dates as printed in the NESO Embedded Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202510.42 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Clachan (SSE GENERATION LIMITED)Hydro and pumped storage40 MWnot statedBuilt
Dornich Hydro Generating StationHydro and pumped storage1.35 MWnot statedBuilt
Clachan GSP (Scottish Hydro Electric Power Distribution Plc)Hydro and pumped storage0.42 MW30 Sep 2025Scoping

Supported by National Energy SO Open Data