N84 Grid

Corriemoillie 132/33kV Substation

NESO connection site, host SHET.

Contracted here0.40 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date30 Sep 2029Date printed in the register

The queue, in order

Order calculated by N84
First in queue400 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Corriemoillie BESS31 May 202430 Sep 2029200 MW
Isenau Four27 Sep 202431 Oct 2033200 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW200 MW400 MW2029: 200 MW2033: 400 MW20292030203120322033400 MW
0 MW200 MW400 MW2029: 200 MW2033: 400 MW202920312033400 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
2029200 MW
2033400 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Corriemoillie BESS200 MW0 MW30 Sep 20291gate 1Scoping
2Isenau Four200 MW200 MW31 Oct 2033not statedgate not printedScoping

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
20291200 MW
20331200 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Corriemoillie BESSBattery storage200 MW30 Sep 2029Scoping
Isenau FourBattery storage200 MW31 Oct 2033Scoping
LochluichartOnshore wind69 MWnot statedBuilt
Corriemoillie Wind FarmOnshore wind47.5 MWnot statedBuilt

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.