DERBYSHIRE CONNECTION NODE E 132 KV SUBSTATION

NESO connection site, host NGET.

Contracted here0.96 GWNot yet connected, as printed
Entries in the queue4entries with a printed MW
Earliest connection date31 Oct 2034Date printed in the register

The queue, in order

Order calculated by N84
First in queue960 MW across the first 4 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Drakelow Power Station 1 BESS31 May 202431 Oct 2034240 MW
Drakelow Power Station 2 BESS22 Jul 202530 Oct 2037240 MW
Lightsource Bagots Farm20 Dec 202430 Oct 2037240 MW
Drakelow Power Station 422 Jul 202530 Oct 2037240 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW500 MW1.0 GW2034: 240 MW2037: 960 MW2034203520362037960 MW
0 MW500 MW1.0 GW2034: 240 MW2037: 960 MW2034203520362037960 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
2034240 MW
2037960 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Drakelow Power Station 1 BESS240 MW0 MW31 Oct 20341gate 1Scoping
2Drakelow Power Station 2 BESS240 MW240 MW30 Oct 20371gate 1Scoping
3Lightsource Bagots Farm240 MW480 MW30 Oct 20371gate 1Scoping
4Drakelow Power Station 4240 MW720 MW30 Oct 20371gate 1Scoping

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
20341240 MW
20373720 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Drakelow Power Station 2 BESSBattery storage240 MW30 Oct 2037Scoping
Lightsource Bagots FarmHybrid240 MW30 Oct 2037Scoping
Drakelow Power Station 1 BESSBattery storage240 MW31 Oct 2034Scoping
Drakelow Power Station 4Battery storage240 MW30 Oct 2037Scoping

Supported by National Energy SO Open Data