Ferrybridge B 132kV Substation

NESO connection site, host NGET.

Contracted here0.30 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date24 Oct 2035Date printed in the register

The queue, in order

Order calculated by N84
First in queue299.9 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Ferrybridge B BESS & Solar Substation31 May 202424 Oct 203599.9 MW
NEL Tiger31 May 202430 Oct 2035200 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW200 MW400 MW2035: 300 MW2035300 MW
0 MW200 MW400 MW2035: 300 MW2035300 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
2035299.9 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Ferrybridge B BESS & Solar Substation99.9 MW0 MW24 Oct 2035not statedgate not printedConsents Approved
2NEL Tiger200 MW99.9 MW30 Oct 2035not statedgate not printedScoping

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
20352299.9 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
NEL TigerBattery storage200 MW30 Oct 2035Scoping
SSE Ferrybridge BESSBattery storage150 MWnot statedBuilt
Ferrybridge B BESS & Solar SubstationHybrid99.9 MW24 Oct 2035Consents Approved

Supported by National Energy SO Open Data