Ironbridge 400kV Substation

NESO connection site, host NGET.

Contracted here1.30 GWNot yet connected, as printed
Entries in the queue3entries with a printed MW
Earliest connection date30 Oct 2029Date printed in the register

The queue, in order

Order calculated by N84
First in queue1,300 MW across the first 3 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Ironbridge Green Energy Centre31 May 202430 Oct 2029400 MW
Ironbridge31 May 202430 Apr 2031600 MW
ELMYA REDNAL31 May 202430 Oct 2034300 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW1.0 GW2.0 GW2029: 400 MW2031: 1.0 GW2034: 1.3 GW2029203020312032203320341.3 GW
0 MW1.0 GW2.0 GW2029: 400 MW2031: 1.0 GW2034: 1.3 GW20292031203320341.3 GW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
2029400 MW
20311,000 MW
20341,300 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Ironbridge Green Energy Centre400 MW0 MW30 Oct 20291gate 1Awaiting Consents
2Ironbridge600 MW400 MW30 Apr 2031not statedgate not printedScoping
3ELMYA REDNAL300 MW1,000 MW30 Oct 20341gate 1Awaiting Consents

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
20291400 MW
20311600 MW
20341300 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Ironbridge (IGP SOLAR 16 LIMITED)Hybrid600 MW30 Apr 2031Scoping
Ironbridge Green Energy CentreHybrid400 MW30 Oct 2029Awaiting Consents
ELMYA REDNALBattery storage300 MW30 Oct 2034Awaiting Consents
Ironbridge - New ConnectionHybrid0 MW30 Dec 2026Scoping