Mybster 2 132/33kV Substation

NESO connection site, host SHET.

Contracted here0.16 GWNot yet connected, as printed
Entries in the queue4entries with a printed MW
Earliest connection date31 Aug 2025Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue161.9 MW across the first 4 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Golticlay Extension Wind Farm7 Nov 202530 Sep 202755 MW
Cogle Moss Wind Farm31 May 202431 Aug 202536 MW
SPITTAL22 Jul 202530 Oct 203049.9 MW
Toftinghall 2 BESS7 Nov 202531 Oct 203021 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW100 MW200 MW2025: 36 MW2027: 91 MW2030: 162 MW202520262027202820292030162 MW
0 MW100 MW200 MW2025: 36 MW2027: 91 MW2030: 162 MW2025202720292030162 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202536 MW
202791 MW
2030161.9 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Golticlay Extension Wind Farm55 MW0 MW30 Sep 20272gate 2Awaiting Consents
2Cogle Moss Wind Farm36 MW55 MW31 Aug 20251gate 1Scoping
3SPITTAL49.9 MW91 MW30 Oct 2030not statedgate not printedScoping
4Toftinghall 2 BESS21 MW140.9 MW31 Oct 2030not statedgate not printedScoping

Receipt: MW and dates as printed in the NESO Embedded Register, file dated 20 Oct 2026; the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2025136 MW
2027155 MW
2030270.9 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Golticlay Extension Wind FarmOnshore wind55 MW30 Sep 2027Awaiting Consents
SPITTALBattery storage49.9 MW30 Oct 2030Scoping
Cogle Moss Wind FarmOnshore wind36 MW31 Aug 2025Scoping
Toftinghall 2 BESSBattery storage21 MW31 Oct 2030Scoping