NORTH KENT CONNECTION NODE C 132KV SUBSTATION

NESO connection site, host NGET.

Contracted here1.21 GWNot yet connected, as printed
Entries in the queue4entries with a printed MW
Earliest connection date31 Oct 2037Date printed in the register

The queue, in order

Order calculated by N84
First in queue1,211.6 MW across the first 4 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Hurst BESS27 Sep 202431 Oct 2037320 MW
Upper College Farm BESS22 Jul 202531 Oct 2037480 MW
Manor Farm_Sidcup22 Jul 202531 Oct 2037199.6 MW
Hurst BESS27 Sep 202431 Oct 2038212 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW1.0 GW2.0 GW2037: 1,000 MW2038: 1.2 GW203720381.2 GW
0 MW1.0 GW2.0 GW2037: 1,000 MW2038: 1.2 GW203720381.2 GW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
2037999.6 MW
20381,211.6 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Hurst BESS320 MW0 MW31 Oct 2037not statedgate not printedScoping
2Upper College Farm BESS480 MW320 MW31 Oct 20371gate 1Scoping
3Manor Farm_Sidcup199.6 MW800 MW31 Oct 20371gate 1Scoping
4Hurst BESS212 MW999.6 MW31 Oct 20381gate 1Scoping

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
20373999.6 MW
20381212 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Upper College Farm BESSBattery storage480 MW31 Oct 2037Scoping
Hurst BESSBattery storage320 MW31 Oct 2037Scoping
Hurst BESSBattery storage212 MW31 Oct 2038Scoping
Manor Farm_SidcupBattery storage199.6 MW31 Oct 2037Scoping