N84 Grid

Peterhead Grange GSP

NESO connection site, host SHET.

Contracted here0.09 GWNot yet connected, as printed
Entries in the queue3entries with a printed MW
Earliest connection date31 Mar 2024Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue85.2 MW across the first 3 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Kirkton Solar PV7 Nov 202531 Mar 202435 MW
Peterhead Grange GSP7 Nov 202531 Oct 20250.2 MW
Project Flora Peterhead21 Mar 202531 Oct 203350 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW50 MW100 MW2024: 35 MW2025: 35 MW2033: 85 MW20242026202820302032203385 MW
0 MW50 MW100 MW2024: 35 MW2025: 35 MW2033: 85 MW202420272030203385 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202435 MW
202535.2 MW
203385.2 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Kirkton Solar PV35 MW0 MW31 Mar 2024not statedgate not printedScoping
2Peterhead Grange GSP0.2 MW35 MW31 Oct 2025not statedgate not printedScoping
3Project Flora Peterhead50 MW35.2 MW31 Oct 2033not statedgate not printedScoping

Receipt: MW and dates as printed in the NESO Embedded Register, file dated 20 Oct 2026; the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2024135 MW
202510.2 MW
2033150 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Project Flora PeterheadOffshore wind50 MW31 Oct 2033Scoping
Kirkton Solar PVSolar35 MW31 Mar 2024Scoping
Hywind Wind FarmHybrid30 MWnot statedBuilt
Peterhead Grange GSP (Scottish Hydro Electric Power Distribution Plc)Solar0.2 MW31 Oct 2025Scoping

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.