Saltcoats A & B (SPD) GSP

NESO connection site, host SPT.

Contracted here0.02 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date30 May 2023Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue17.48 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

  • Nethermains7 Nov 2025 to 30 May 2023, date already passed (gate not printed)
  • Berry BPI Wind Farm7 Nov 2025 to 21 Aug 2028 (gate not printed)
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Nethermains7 Nov 202530 May 20237.48 MW
Berry BPI Wind Farm7 Nov 202521 Aug 202810 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW10 MW20 MW2023: 7 MW2028: 17 MW20232024202520262027202817 MW
0 MW10 MW20 MW2023: 7 MW2028: 17 MW202320252027202817 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20237.48 MW
202817.48 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Nethermains7.48 MW0 MW30 May 2023not statedgate not printedScoping
2Berry BPI Wind Farm10 MW7.48 MW21 Aug 2028not statedgate not printedScoping

Receipt: MW and dates as printed in the NESO Embedded Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202317.48 MW
2028110 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Millour Hill Wind FarmOnshore wind24 MWnot statedBuilt
Sorbie WindfarmOnshore wind12.6 MWnot statedBuilt
Berry BPI Wind FarmOnshore wind10 MW21 Aug 2028Scoping
NethermainsSolar7.48 MW30 May 2023Scoping
Lochcraigs Farm PV FarmSolar4.75 MWnot statedBuilt
Zebec BiogasBiomass and waste2.5 MWnot statedBuilt
Halkshill HydroHydro and pumped storage1.34 MWnot statedBuilt
Pundeavon FarmOnshore wind0.9 MWnot statedBuilt
Watson Autos Wind TurbineOnshore wind0.5 MWnot statedBuilt
Highland Meats CHPGas0.13 MWnot statedBuilt

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.