Shin 1 GSP

NESO connection site, host SHET.

Contracted here0.16 GWNot yet connected, as printed
Entries in the queue3entries with a printed MW
Earliest connection date30 Jun 2031Date printed in the register

The queue, in order

Order calculated by N84
First in queue164 MW across the first 3 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Allt an Tuir Renewable Energy Park31 May 202430 Jun 203150 MW
Meall Buidhe Wind Farm20 Dec 202431 Oct 203240 MW
Strath Oykel Wind Farm21 Mar 202531 Oct 203274 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW100 MW200 MW2031: 50 MW2032: 164 MW20312032164 MW
0 MW100 MW200 MW2031: 50 MW2032: 164 MW20312032164 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
203150 MW
2032164 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Allt an Tuir Renewable Energy Park50 MW0 MW30 Jun 2031not statedgate not printedScoping
2Meall Buidhe Wind Farm40 MW50 MW31 Oct 2032not statedgate not printedScoping
3Strath Oykel Wind Farm74 MW90 MW31 Oct 2032not statedgate not printedAwaiting Consents

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2031150 MW
20322114 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Strath Oykel Wind FarmHybrid74 MW31 Oct 2032Awaiting Consents
Allt an Tuir Renewable Energy ParkHybrid50 MW30 Jun 2031Scoping
Meall Buidhe Wind FarmOnshore wind40 MW31 Oct 2032Scoping
RosehallOnshore wind24.7 MWnot statedBuilt
Shin (SSE GENERATION LIMITED)Hydro and pumped storage18.6 MWnot statedBuilt