South Humber Connection Node A 400kV

NESO connection site, host NGET.

Contracted here2.28 GWNot yet connected, as printed
Entries in the queue5entries with a printed MW
Earliest connection date30 Oct 2035Date printed in the register

The queue, in order

Order calculated by N84
First in queue2,280 MW across the first 5 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Butt Lane - Grimsby BESS21 Mar 202530 Oct 2035240 MW
Sweet Briar Energy Park22 Jul 202530 Oct 2035800 MW
Killingholme Energy Park22 Jul 202531 Oct 2035500 MW
Crawcroft Lane Solar and Storage22 Jul 202530 Oct 2039240 MW
Lincolnshire Energy Park22 Jul 202530 Oct 2039500 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW1.3 GW2.5 GW2035: 1.5 GW2039: 2.3 GW203520362037203820392.3 GW
0 MW1.3 GW2.5 GW2035: 1.5 GW2039: 2.3 GW2035203720392.3 GW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20351,540 MW
20392,280 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Butt Lane - Grimsby BESS240 MW0 MW30 Oct 20351gate 1Scoping
2Sweet Briar Energy Park800 MW240 MW30 Oct 2035not statedgate not printedScoping
3Killingholme Energy Park500 MW1,040 MW31 Oct 2035not statedgate not printedScoping
4Crawcroft Lane Solar and Storage240 MW1,540 MW30 Oct 20391gate 1Scoping
5Lincolnshire Energy Park500 MW1,780 MW30 Oct 2039not statedgate not printedScoping

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
203531,540 MW
20392740 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Sweet Briar Energy ParkHybrid800 MW30 Oct 2035Scoping
Lincolnshire Energy ParkHybrid500 MW30 Oct 2039Scoping
Killingholme Energy ParkHybrid500 MW31 Oct 2035Scoping
Crawcroft Lane Solar and StorageHybrid240 MW30 Oct 2039Scoping
Butt Lane - Grimsby BESSBattery storage240 MW30 Oct 2035Scoping