N84 Grid

Tongland 132/11kV

NESO connection site, host SPT.

Contracted here0.10 GWNot yet connected, as printed
Entries in the queue3entries with a printed MW
Earliest connection date26 Aug 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue101.1 MW across the first 3 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
St Marys Isle Solar Farm31 May 202414 Jun 203036 MW
Culraven Solar Farm7 Nov 202526 Aug 202729.9 MW
Glen Farm Wind7 Nov 202531 Oct 203635.2 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW100 MW200 MW2027: 30 MW2030: 66 MW2036: 101 MW202720292031203320352036101 MW
0 MW100 MW200 MW2027: 30 MW2030: 66 MW2036: 101 MW2027203020332036101 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202729.9 MW
203065.9 MW
2036101.1 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1St Marys Isle Solar Farm36 MW0 MW14 Jun 20302gate 2Consents Approved
2Culraven Solar Farm29.9 MW36 MW26 Aug 2027not statedgate not printedScoping
3Glen Farm Wind35.2 MW65.9 MW31 Oct 20361gate 1Scoping

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026; the NESO Embedded Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2027129.9 MW
2030136 MW
2036135.2 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
St Marys Isle Solar FarmHybrid36 MW14 Jun 2030Consents Approved
Glen Farm WindHybrid35.2 MW31 Oct 2036Scoping
Tongland (Drax River Hydro Limited)Hydro and pumped storage33 MWnot statedBuilt
Culraven Solar FarmSolar29.9 MW26 Aug 2027Scoping

Supported by National Energy SO Open Data