Whitelee Extension 275/33kV

NESO connection site, host SPT.

Contracted here0.09 GWNot yet connected, as printed
Entries in the queue1entry with a printed MW
Earliest connection date29 Sep 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue89 MW across the first project
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

  • Airtnoch BESS27 Sep 2024 to 29 Sep 2027 (gate 1)
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Airtnoch BESS27 Sep 202429 Sep 202789 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW50 MW100 MW2027: 89 MW202789 MW
0 MW50 MW100 MW2027: 89 MW202789 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202789 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Airtnoch BESS89 MW0 MW29 Sep 20271gate 1Awaiting Consents

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2027189 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Whitelee Extension (SCOTTISHPOWER RENEWABLES (UK) LIMITED)Hybrid238 MW1 Dec 2026Built
Airtnoch BESSBattery storage89 MW29 Sep 2027Awaiting Consents
Airtnoch BESSSolar0 MWnot statedScoping

Supported by National Energy SO Open Data