DNO substation.

Contracted here0.05 GWNot yet connected, as printed
Entries in the queue10entries with a printed MW
Earliest connection date21 Aug 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue16.69 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Avonmouth (solar)26 Apr 202221 Aug 20263.5 MW
Avonmouth (gas)22 Dec 202128 Aug 20264 MW
Avonmouth (hybrid)26 Apr 202228 Aug 20263.5 MW
Avonmouth (solar)4 Jun 202428 Aug 20260.33 MW
Avonmouth (solar)20 Apr 20231 Oct 20260.46 MW
Avonmouth (solar)11 Sep 202519 Nov 20264.9 MW
Avonmouth (solar)10 Sep 202521 Jan 20272.5 MW
Avonmouth Bsp (bess)3 Mar 202322 Apr 202720 MW
Avonmouth Bsp (bess)20 May 202212 Apr 202910 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW25 MW50 MW2026: 17 MW2027: 39 MW2029: 49 MW202620272028202949 MW
0 MW25 MW50 MW2026: 17 MW2027: 39 MW2029: 49 MW202620272028202949 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202616.69 MW
202739.19 MW
202949.19 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Avonmouth (solar)3.5 MW0 MW21 Aug 2026not statedgate not printedAccepted to Connect
2Avonmouth (gas)4 MW3.5 MW28 Aug 2026not statedgate not printedAccepted to Connect
3Avonmouth (hybrid)3.5 MW7.5 MW28 Aug 2026not statedgate not printedAccepted to Connect
4Avonmouth (solar)0.33 MW11 MW28 Aug 2026not statedgate not printedAccepted to Connect
5Avonmouth (solar)0.46 MW11.33 MW1 Oct 2026not statedgate not printedAccepted to Connect
6Avonmouth (solar)4.9 MW11.79 MW19 Nov 2026not statedgate not printedAccepted to Connect
7Avonmouth (solar)2.5 MW16.69 MW21 Jan 2027not statedgate not printedAccepted to Connect
8Avonmouth Bsp (bess)20 MW19.19 MW22 Apr 2027not statedgate not printedAccepted to Connect
9Avonmouth Bsp (bess)10 MW39.19 MW12 Apr 2029not statedgate not printedAccepted to Connect
10Avonmouth (solar)0.18 MW49.19 MWnot statednot statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2026616.69 MW
2027222.5 MW
2029110 MW
not stated10.18 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Avonmouth (battery, 20 MW)Battery storage20 MW22 Apr 2027Accepted to Connect
Avonmouth (gas, 19 MW)Gas19 MWnot statedConnected
Avonmouth (thermal, 13.3 MW)Thermal13.3 MWnot statedConnected
Avonmouth (battery, 10 MW)Battery storage10 MW12 Apr 2029Accepted to Connect
Avonmouth (solar, 4.9 MW)Solar4.9 MW19 Nov 2026Accepted to Connect
Avonmouth (other, 3.8 MW)Other3.8 MWnot statedConnected
Avonmouth (solar, 3.5 MW)Solar3.5 MW21 Aug 2026Accepted to Connect
Avonmouth (hybrid, 3.5 MW)Hybrid3.5 MW28 Aug 2026Accepted to Connect
Avonmouth (solar, 3.49 MW)Solar3.49 MWnot statedConnected
Avonmouth (solar, 2.5 MW)Solar2.5 MW21 Jan 2027Accepted to Connect
Avonmouth (solar, 1.43 MW)Solar1.43 MWnot statedConnected
Avonmouth (solar, 1.37 MW)Solar1.37 MWnot statedConnected
Avonmouth (other, 0.73 MW)Other0.73 MWnot statedConnected
Avonmouth (solar, 0.33 MW)Solar0.33 MW28 Aug 2026Accepted to Connect
Avonmouth (solar, 0.25 MW)Solar0.25 MW1 Oct 2026Accepted to Connect
Avonmouth (hybrid, 0.22 MW)Hybrid0.22 MWnot statedConnected
Avonmouth (solar, 0.19 MW)Solar0.19 MWnot statedConnected
Avonmouth (solar, 0.18 MW)Solar0.18 MWnot statedAccepted to Connect
Avonmouth (solar, 0.09 MW)Solar0.09 MWnot statedConnected
Avonmouth (gas)Gas0 MW28 Aug 2026Accepted to Connect

Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.