N84 Grid

Birchfield Lane 132/11Kv

DNO substation.

Contracted here0.00 GWNot yet connected, as printed
Entries in the queue7entries with a printed MW
Earliest connection date18 Sep 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue2.22 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Birchfield Lane 132/11Kv (bess)20 Jul 202618 Sep 20260.2 MW
Birchfield Lane 132/11Kv (solar)24 Sep 20251 Oct 20260.24 MW
Birchfield Lane 132/11Kv (solar)4 Sep 202311 Nov 20260.99 MW
Birchfield Lane 132/11Kv (solar)17 Jan 20251 Dec 20260.55 MW
Birchfield Lane 132/11Kv (solar)29 Sep 202211 Feb 20270.12 MW
Birchfield Lane 132/11Kv (solar)24 Jan 20231 Mar 20270.12 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW1 MW3 MW2026: 2 MW2027: 2 MW202620272 MW
0 MW1 MW3 MW2026: 2 MW2027: 2 MW202620272 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20261.98 MW
20272.22 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Birchfield Lane 132/11Kv (bess)0.2 MW0 MW18 Sep 2026not statedgate not printedAccepted to Connect
2Birchfield Lane 132/11Kv (solar)0.24 MW0.2 MW1 Oct 2026not statedgate not printedAccepted to Connect
3Birchfield Lane 132/11Kv (solar)0.99 MW0.44 MW11 Nov 2026not statedgate not printedAccepted to Connect
4Birchfield Lane 132/11Kv (solar)0.55 MW1.43 MW1 Dec 2026not statedgate not printedAccepted to Connect
5Birchfield Lane 132/11Kv (solar)0.12 MW1.98 MW11 Feb 2027not statedgate not printedAccepted to Connect
6Birchfield Lane 132/11Kv (solar)0.12 MW2.1 MW1 Mar 2027not statedgate not printedAccepted to Connect
7Birchfield Lane 132/11Kv (solar)0.07 MW2.22 MWnot statednot statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202641.98 MW
202720.24 MW
not stated10.07 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Birchfield Lane 132/11Kv (gas, 1.43 MW)Gas1.43 MWnot statedConnected
Birchfield Lane 132/11Kv (solar, 0.99 MW)Solar0.99 MW11 Nov 2026Accepted to Connect
Birchfield Lane 132/11Kv (solar, 0.44 MW)Solar0.44 MW1 Dec 2026Accepted to Connect
Birchfield Lane 132/11Kv (solar, 0.38 MW)Solar0.38 MWnot statedConnected
Birchfield Lane 132/11Kv (solar, 0.24 MW)Solar0.24 MW1 Oct 2026Accepted to Connect
Birchfield Lane 132/11Kv (battery, 0.2 MW)Battery storage0.2 MW18 Sep 2026Accepted to Connect
Birchfield Lane 132/11Kv (solar, 0.12 MW)Solar0.12 MW1 Mar 2027Accepted to Connect
Birchfield Lane 132/11Kv (solar, 0.12 MW)Solar0.12 MW11 Feb 2027Accepted to Connect
Birchfield Lane 132/11Kv (gas, 0.11 MW)Gas0.11 MWnot statedConnected
Birchfield Lane 132/11Kv (solar, 0.1 MW)Solar0.1 MWnot statedConnected
Birchfield Lane 132/11Kv (solar, 0.1 MW)Solar0.1 MWnot statedConnected
Birchfield Lane 132/11Kv (solar, 0.07 MW)Solar0.07 MWnot statedConnected
Birchfield Lane 132/11Kv (solar, 0.05 MW)Solar0.05 MWnot statedConnected
Birchfield Lane 132/11Kv (solar)Solar0 MWnot statedAccepted to Connect

Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.