Bletchley 11Kv S Stn

DNO substation.

Contracted here0.01 GWNot yet connected, as printed
Entries in the queue5entries with a printed MW
Earliest connection date10 Sep 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue14.69 MW across the first 5 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Bletchley 11Kv S Stn (bess)5 Jul 202510 Sep 20260.2 MW
Bletchley 11Kv S Stn (solar)11 Nov 202524 Sep 20260.13 MW
Bletchley 33Kv S Stn (hybrid)2 Oct 202415 Dec 202614 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW10 MW20 MW2026: 14 MW202614 MW
0 MW10 MW20 MW2026: 14 MW202614 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202614.33 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Bletchley 11Kv S Stn (bess)0.2 MW0 MW10 Sep 2026not statedgate not printedAccepted to Connect
2Bletchley 11Kv S Stn (solar)0.13 MW0.2 MW24 Sep 2026not statedgate not printedAccepted to Connect
3Bletchley 33Kv S Stn (hybrid)14 MW0.33 MW15 Dec 2026not statedgate not printedAccepted to Connect
4Bletchley 11Kv S Stn (bess)0.25 MW14.33 MWnot statednot statedgate not printedAccepted to Connect
5Bletchley 11Kv S Stn (solar)0.11 MW14.58 MWnot statednot statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2026314.33 MW
not stated20.36 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Bletchley 11Kv S Stn (gas, 19 MW)Gas19 MWnot statedConnected
Bletchley 11Kv S Stn (hybrid, 14 MW)Hybrid14 MW15 Dec 2026Accepted to Connect
Bletchley 11Kv S Stn (other, 13.3 MW)Other13.3 MWnot statedConnected
Bletchley 11Kv S Stn (gas, 6.01 MW)Gas6.01 MWnot statedConnected
Bletchley 11Kv S Stn (other, 0.76 MW)Other0.76 MWnot statedConnected
Bletchley 11Kv S Stn (battery, 0.25 MW)Battery storage0.25 MWnot statedAccepted to Connect
Bletchley 11Kv S Stn (battery, 0.2 MW)Battery storage0.2 MW10 Sep 2026Accepted to Connect
Bletchley 11Kv S Stn (solar, 0.19 MW)Solar0.19 MWnot statedConnected
Bletchley 11Kv S Stn (solar, 0.19 MW)Solar0.19 MWnot statedConnected
Bletchley 11Kv S Stn (solar, 0.16 MW)Solar0.16 MWnot statedConnected
Bletchley 11Kv S Stn (solar, 0.13 MW)Solar0.13 MW24 Sep 2026Accepted to Connect
Bletchley 11Kv S Stn (solar, 0.11 MW)Solar0.11 MWnot statedAccepted to Connect
Bletchley 11Kv S Stn (solar, 0.08 MW)Solar0.08 MWnot statedConnected