N84 Grid

Bridgwater Grid Bsp

DNO substation.

Contracted here0.16 GWNot yet connected, as printed
Entries in the queue6entries with a printed MW
Earliest connection date20 Nov 2026Date printed in the register

The queue, in order

Order calculated by N84
First in queue159.5 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Bridgwater Grid Bsp (solar)7 Jul 202520 Nov 202616.1 MW
Bridgwater Grid Bsp (solar)2 Apr 20196 Jan 202740 MW
Bridgwater Grid Bsp (solar)4 Feb 20228 Jun 202719.4 MW
Bridgwater Grid Bsp (solar)24 Jun 202110 Jun 202730 MW
Bridgwater Grid Bsp (solar)22 Sep 20211 Jul 202714 MW
Bridgwater Grid Bsp (hybrid)1 Jul 202622 Nov 202740 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW100 MW200 MW2026: 16 MW2027: 160 MW20262027160 MW
0 MW100 MW200 MW2026: 16 MW2027: 160 MW20262027160 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202616.1 MW
2027159.5 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Bridgwater Grid Bsp (solar)16.1 MW0 MW20 Nov 2026not statedgate not printedAccepted to Connect
2Bridgwater Grid Bsp (solar)40 MW16.1 MW6 Jan 2027not statedgate not printedAccepted to Connect
3Bridgwater Grid Bsp (solar)19.4 MW56.1 MW8 Jun 2027not statedgate not printedAccepted to Connect
4Bridgwater Grid Bsp (solar)30 MW75.5 MW10 Jun 2027not statedgate not printedAccepted to Connect
5Bridgwater Grid Bsp (solar)14 MW105.5 MW1 Jul 2027not statedgate not printedAccepted to Connect
6Bridgwater Grid Bsp (hybrid)40 MW119.5 MW22 Nov 2027not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2026116.1 MW
20275143.4 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Bridgwater Grid Bsp (solar, 40 MW)Solar40 MW6 Jan 2027Accepted to Connect
Bridgwater Grid Bsp (solar, 30 MW)Solar30 MW10 Jun 2027Accepted to Connect
Bridgwater Grid Bsp (hybrid, 20 MW)Hybrid20 MW22 Nov 2027Accepted to Connect
Bridgwater Grid Bsp (solar, 19.4 MW)Solar19.4 MW8 Jun 2027Accepted to Connect
Bridgwater Grid Bsp (solar, 19.39 MW)Solar19.39 MWnot statedConnected
Bridgwater Grid Bsp (solar, 16.1 MW)Solar16.1 MW20 Nov 2026Accepted to Connect
Bridgwater Grid Bsp (solar, 14 MW)Solar14 MW1 Jul 2027Accepted to Connect
Bridgwater Grid Bsp (gas, 9.21 MW)Gas9.22 MWnot statedConnected
Bridgwater Grid Bsp (solar, 7.73 MW)Solar7.73 MWnot statedConnected
Bridgwater Grid Bsp (solar, 7.06 MW)Solar7.06 MWnot statedConnected
Bridgwater Grid Bsp (solar, 6.65 MW)Solar6.65 MWnot statedConnected
Bridgwater Grid Bsp (solar, 5.7 MW)Solar5.7 MWnot statedConnected
Bridgwater Grid Bsp (solar, 5.02 MW)Solar5.02 MWnot statedConnected
Bridgwater Grid Bsp (solar, 4.75 MW)Solar4.75 MWnot statedConnected
Bridgwater Grid Bsp (solar, 4.75 MW)Solar4.75 MWnot statedConnected
Bridgwater Grid Bsp (solar, 4.4 MW)Solar4.4 MWnot statedConnected
Bridgwater Grid Bsp (solar, 4.08 MW)Solar4.08 MWnot statedConnected
Bridgwater Grid Bsp (solar, 4.08 MW)Solar4.08 MWnot statedConnected
Bridgwater Grid Bsp (solar, 2.82 MW)Solar2.82 MWnot statedConnected

Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.