N84 Grid

Burton South 33Kv S Stn

DNO substation.

Contracted here0.04 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date17 Jun 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue42 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Burton South 33Kv S Stn (bess)23 Feb 202217 Jun 202722 MW
Burton South 33Kv S Stn (thermal)14 Oct 20211 Nov 202920 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW25 MW50 MW2027: 22 MW2029: 42 MW20272028202942 MW
0 MW25 MW50 MW2027: 22 MW2029: 42 MW20272028202942 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202722 MW
202942 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Burton South 33Kv S Stn (bess)22 MW0 MW17 Jun 2027not statedgate not printedAccepted to Connect
2Burton South 33Kv S Stn (thermal)20 MW22 MW1 Nov 2029not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2027122 MW
2029120 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Burton South 33Kv S Stn (battery, 22 MW)Battery storage22 MW17 Jun 2027Accepted to Connect
Burton South 33Kv S Stn (thermal, 20 MW)Thermal20 MW1 Nov 2029Accepted to Connect
Burton South 33Kv S Stn (gas, 18 MW)Gas18 MWnot statedConnected
Burton South 33Kv S Stn (battery, 9.5 MW)Battery storage9.5 MWnot statedConnected
Burton South 33Kv S Stn (solar, 4.75 MW)Solar4.75 MWnot statedConnected