N84 Grid

Clipstone 33Kv S Stn

DNO substation.

Contracted here0.07 GWNot yet connected, as printed
Entries in the queue1entry with a printed MW
Earliest connection date30 Dec 2032Date printed in the register

The queue, in order

Order calculated by N84
First in queue70 MW across the first project
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Clipstone 132Kv S Stn (hybrid)24 Aug 202430 Dec 203270 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW40 MW80 MW2032: 70 MW203270 MW
0 MW40 MW80 MW2032: 70 MW203270 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
203270 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Clipstone 132Kv S Stn (hybrid)70 MW0 MW30 Dec 2032not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2032170 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Clipstone 33Kv S Stn (hybrid, 35 MW)Hybrid35 MW30 Dec 2032Accepted to Connect
Clipstone 33Kv S Stn (solar, 16.15 MW)Solar16.15 MWnot statedConnected
Clipstone 33Kv S Stn (solar, 11.25 MW)Solar11.25 MWnot statedConnected
Clipstone 33Kv S Stn (onshore wind, 10.03 MW)Onshore wind10.03 MWnot statedConnected
Clipstone 33Kv S Stn (solar, 9.5 MW)Solar9.5 MWnot statedConnected
Clipstone 33Kv S Stn (solar, 9.12 MW)Solar9.12 MWnot statedConnected
Clipstone 33Kv S Stn (solar, 4.75 MW)Solar4.75 MWnot statedConnected
Clipstone 33Kv S Stn (solar, 0.1 MW)Solar0.1 MWnot statedConnected
Clipstone 33Kv S Stn (solar, 0.1 MW)Solar0.1 MWnot statedConnected