Exeter Main Sgp

DNO substation.

Contracted here0.55 GWNot yet connected, as printed
Entries in the queue6entries with a printed MW
Earliest connection date18 Jan 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue548.7 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Exeter Main Sgp (hybrid)5 Dec 202418 Jan 202774.8 MW
Exeter Main Sgp (hybrid)19 Oct 20234 Mar 2027114 MW
Exeter Main Sgp (solar)8 Aug 201812 Apr 202749.9 MW
Exeter Main Sgp (bess)12 Jun 202512 Aug 2027125 MW
Exeter Main Sgp (hybrid)4 Apr 202520 Aug 2027155 MW
Exeter Main Sgp (solar)20 Oct 202328 Sep 202730 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW400 MW800 MW2027: 549 MW2027549 MW
0 MW400 MW800 MW2027: 549 MW2027549 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
2027548.7 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Exeter Main Sgp (hybrid)74.8 MW0 MW18 Jan 2027not statedgate not printedAccepted to Connect
2Exeter Main Sgp (hybrid)114 MW74.8 MW4 Mar 2027not statedgate not printedAccepted to Connect
3Exeter Main Sgp (solar)49.9 MW188.8 MW12 Apr 2027not statedgate not printedAccepted to Connect
4Exeter Main Sgp (bess)125 MW238.7 MW12 Aug 2027not statedgate not printedAccepted to Connect
5Exeter Main Sgp (hybrid)155 MW363.7 MW20 Aug 2027not statedgate not printedAccepted to Connect
6Exeter Main Sgp (solar)30 MW518.7 MW28 Sep 2027not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
20276548.7 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Exeter Main Sgp (battery, 125 MW)Battery storage125 MW12 Aug 2027Accepted to Connect
Exeter Main Sgp (hybrid, 95 MW)Hybrid95 MW20 Aug 2027Accepted to Connect
Exeter Main Sgp (solar, 49.9 MW)Solar49.9 MW12 Apr 2027Accepted to Connect
Exeter Main Sgp (hybrid, 49.9 MW)Hybrid49.9 MW18 Jan 2027Accepted to Connect
Exeter Main Sgp (hybrid, 49.9 MW)Hybrid49.9 MW4 Mar 2027Accepted to Connect
Exeter Main Sgp (hybrid, 34.98 MW)Hybrid34.98 MWnot statedConnected
Exeter Main Sgp (solar, 30 MW)Solar30 MW28 Sep 2027Accepted to Connect

Supported by NGED Open Data