N84 Grid

Grange Bsp

DNO substation.

Contracted here0.07 GWNot yet connected, as printed
Entries in the queue4entries with a printed MW
Earliest connection date30 Nov 2026Date printed in the register

The queue, in order

Order calculated by N84
First in queue66.05 MW across the first 4 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Grange (thermal)16 Dec 201930 Nov 202619 MW
Grange Bsp (solar)23 Jan 202510 Oct 20274.55 MW
Grange Bsp (thermal)17 Jan 202517 Jan 202922 MW
Grange (wind on)18 Feb 202231 Aug 203020.5 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW40 MW80 MW2026: 19 MW2027: 24 MW2029: 46 MW2030: 66 MW2026202720282029203066 MW
0 MW40 MW80 MW2026: 19 MW2027: 24 MW2029: 46 MW2030: 66 MW20262028203066 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202619 MW
202723.55 MW
202945.55 MW
203066.05 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Grange (thermal)19 MW0 MW30 Nov 2026not statedgate not printedAccepted to Connect
2Grange Bsp (solar)4.55 MW19 MW10 Oct 2027not statedgate not printedAccepted to Connect
3Grange Bsp (thermal)22 MW23.55 MW17 Jan 2029not statedgate not printedAccepted to Connect
4Grange (wind on)20.5 MW45.55 MW31 Aug 2030not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2026119 MW
202714.55 MW
2029122 MW
2030120.5 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Grange Bsp (onshore wind, 32.02 MW)Onshore wind32.02 MWnot statedConnected
Grange Bsp (thermal, 22 MW)Thermal22 MW17 Jan 2029Accepted to Connect
Grange Bsp (onshore wind, 20.5 MW)Onshore wind20.5 MW31 Aug 2030Accepted to Connect
Grange Bsp (thermal, 19 MW)Thermal19 MW30 Nov 2026Accepted to Connect
Grange Bsp (solar)Solar0 MW10 Oct 2027Accepted to Connect

Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.