N84 Grid

Lincoln Main No 1 33Kv S Stn

DNO substation.

Contracted here0.05 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date16 Apr 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue49.28 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Lincoln Main No 1 33Kv S Stn (solar)24 Oct 202316 Apr 202729 MW
Lincoln Main No 1 33Kv S Stn (solar)25 Mar 202413 Aug 202720.28 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW25 MW50 MW2027: 49 MW202749 MW
0 MW25 MW50 MW2027: 49 MW202749 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202749.28 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Lincoln Main No 1 33Kv S Stn (solar)29 MW0 MW16 Apr 2027not statedgate not printedAccepted to Connect
2Lincoln Main No 1 33Kv S Stn (solar)20.28 MW29 MW13 Aug 2027not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2027249.28 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Lincoln Main No 1 33Kv S Stn (solar, 29 MW)Solar29 MW16 Apr 2027Accepted to Connect
Lincoln Main No 1 33Kv S Stn (solar, 28.5 MW)Solar28.5 MWnot statedConnected
Lincoln Main No 1 33Kv S Stn (solar, 20.28 MW)Solar20.28 MW13 Aug 2027Accepted to Connect
Lincoln Main No 1 33Kv S Stn (solar, 19 MW)Solar19 MWnot statedConnected
Lincoln Main No 1 33Kv S Stn (solar, 14.25 MW)Solar14.25 MWnot statedConnected
Lincoln Main No 1 33Kv S Stn (thermal, 12.45 MW)Thermal12.45 MWnot statedConnected

Supported by NGED Open Data