N84 Grid

Pembroke Power Station

DNO substation.

Contracted here0.43 GWNot yet connected, as printed
Entries in the queue6entries with a printed MW
Earliest connection date10 Dec 2026Date printed in the register

The queue, in order

Order calculated by N84
First in queue428.8 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Pembroke Power Station (bess)30 Aug 202310 Dec 202649.9 MW
Pembroke Power Station (solar)5 Nov 202414 Apr 202749.9 MW
Pembroke Power Station (hybrid)13 Jan 202328 Apr 202742 MW
Pembroke Power Station (hybrid)2 May 20252 Sep 2027192 MW
Pembroke Power Station Bsp (solar)20 Aug 20209 Sep 202730 MW
Pembroke Power Station (hybrid)26 Feb 202426 Nov 202765 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW250 MW500 MW2026: 50 MW2027: 429 MW20262027429 MW
0 MW250 MW500 MW2026: 50 MW2027: 429 MW20262027429 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202649.9 MW
2027428.8 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Pembroke Power Station (bess)49.9 MW0 MW10 Dec 2026not statedgate not printedAccepted to Connect
2Pembroke Power Station (solar)49.9 MW49.9 MW14 Apr 2027not statedgate not printedAccepted to Connect
3Pembroke Power Station (hybrid)42 MW99.8 MW28 Apr 2027not statedgate not printedAccepted to Connect
4Pembroke Power Station (hybrid)192 MW141.8 MW2 Sep 2027not statedgate not printedAccepted to Connect
5Pembroke Power Station Bsp (solar)30 MW333.8 MW9 Sep 2027not statedgate not printedAccepted to Connect
6Pembroke Power Station (hybrid)65 MW363.8 MW26 Nov 2027not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2026149.9 MW
20275378.9 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Pembroke Power Station (hybrid, 96 MW)Hybrid96 MW2 Sep 2027Accepted to Connect
Pembroke Power Station (hybrid, 65 MW)Hybrid65 MW26 Nov 2027Accepted to Connect
Pembroke Power Station (battery, 49.9 MW)Battery storage49.9 MW10 Dec 2026Accepted to Connect
Pembroke Power Station (solar, 49.9 MW)Solar49.9 MW14 Apr 2027Accepted to Connect
Pembroke Power Station (hybrid, 30 MW)Hybrid30 MW28 Apr 2027Accepted to Connect
Pembroke Power Station (solar, 30 MW)Solar30 MW9 Sep 2027Accepted to Connect

Supported by NGED Open Data