Pyle Bsp

DNO substation.

Contracted here0.42 GWNot yet connected, as printed
Entries in the queue11entries with a printed MW
Earliest connection date19 Feb 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue134.48 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Pyle Bsp (wind on)27 Jan 202119 Feb 202750 MW
Pyle Primary (solar)19 May 202111 Mar 202729 MW
Pyle Bsp (hybrid)8 Mar 202427 Jul 202710.2 MW
Pyle Bsp (hybrid)20 Mar 202328 Oct 20273.28 MW
Pyle Grid (bess)20 May 20242 Mar 20287 MW
Pyle Bsp (wind on)14 Oct 201428 Feb 202935 MW
Pyle Grid (wind on)1 Dec 202131 Aug 203016.4 MW
Pyle Grid (wind on)11 Jan 201630 Jun 203123.8 MW
Pyle Grid (solar)12 Mar 20256 Dec 203644 MW
Pyle Grid (hybrid)20 Jan 202531 Oct 2037140 MW
Pyle Grid (wind on)13 Jan 202330 Jan 203865 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW250 MW500 MW2027: 92 MW2028: 99 MW2029: 134 MW2030: 151 MW2031: 175 MW2036: 219 MW2037: 359 MW2038: 424 MW202720292031203320352038424 MW
0 MW250 MW500 MW2027: 92 MW2028: 99 MW2029: 134 MW2030: 151 MW2031: 175 MW2036: 219 MW2037: 359 MW2038: 424 MW20272030203320362038424 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202792.48 MW
202899.48 MW
2029134.48 MW
2030150.88 MW
2031174.68 MW
2036218.68 MW
2037358.68 MW
2038423.68 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Pyle Bsp (wind on)50 MW0 MW19 Feb 2027not statedgate not printedAccepted to Connect
2Pyle Primary (solar)29 MW50 MW11 Mar 2027not statedgate not printedAccepted to Connect
3Pyle Bsp (hybrid)10.2 MW79 MW27 Jul 2027not statedgate not printedAccepted to Connect
4Pyle Bsp (hybrid)3.28 MW89.2 MW28 Oct 2027not statedgate not printedAccepted to Connect
5Pyle Grid (bess)7 MW92.48 MW2 Mar 2028not statedgate not printedAccepted to Connect
6Pyle Bsp (wind on)35 MW99.48 MW28 Feb 2029not statedgate not printedAccepted to Connect
7Pyle Grid (wind on)16.4 MW134.48 MW31 Aug 2030not statedgate not printedAccepted to Connect
8Pyle Grid (wind on)23.8 MW150.88 MW30 Jun 2031not statedgate not printedAccepted to Connect
9Pyle Grid (solar)44 MW174.68 MW6 Dec 2036not statedgate not printedAccepted to Connect
10Pyle Grid (hybrid)140 MW218.68 MW31 Oct 2037not statedgate not printedAccepted to Connect
11Pyle Grid (wind on)65 MW358.68 MW30 Jan 2038not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2027492.48 MW
202817 MW
2029135 MW
2030116.4 MW
2031123.8 MW
2036144 MW
20371140 MW
2038165 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Pyle Bsp (hybrid, 90 MW)Hybrid90 MW31 Oct 2037Accepted to Connect
Pyle Bsp (onshore wind, 65 MW)Onshore wind65 MW30 Jan 2038Accepted to Connect
Pyle Bsp (onshore wind, 50 MW)Onshore wind50 MW19 Feb 2027Accepted to Connect
Pyle Bsp (thermal, 44.6 MW)Thermal44.6 MWnot statedConnected
Pyle Bsp (solar, 40 MW)Solar40 MW6 Dec 2036Accepted to Connect
Pyle Bsp (onshore wind, 35 MW)Onshore wind35 MW28 Feb 2029Accepted to Connect
Pyle Bsp (solar, 29 MW)Solar29 MW11 Mar 2027Accepted to Connect
Pyle Bsp (onshore wind, 24.98 MW)Onshore wind24.99 MWnot statedConnected
Pyle Bsp (onshore wind, 24 MW)Onshore wind24 MWnot statedConnected
Pyle Bsp (onshore wind, 23.8 MW)Onshore wind23.8 MW30 Jun 2031Accepted to Connect
Pyle Bsp (onshore wind, 16.4 MW)Onshore wind16.4 MW31 Aug 2030Accepted to Connect
Pyle Bsp (thermal, 15.01 MW)Thermal15.01 MWnot statedConnected
Pyle Bsp (hybrid, 9.9 MW)Hybrid9.9 MW27 Jul 2027Accepted to Connect
Pyle Bsp (other, 9.12 MW)Other9.12 MWnot statedConnected
Pyle Bsp (battery, 7 MW)Battery storage7 MW2 Mar 2028Accepted to Connect
Pyle Bsp (onshore wind, 5 MW)Onshore wind5 MWnot statedConnected
Pyle Bsp (solar, 4.75 MW)Solar4.75 MWnot statedConnected
Pyle Bsp (solar, 3.61 MW)Solar3.61 MWnot statedConnected
Pyle Bsp (onshore wind, 0.47 MW)Onshore wind0.48 MWnot statedConnected
Pyle Bsp (solar, 0.14 MW)Solar0.14 MWnot statedConnected
Pyle Bsp (solar, 0.13 MW)Solar0.13 MWnot statedConnected
Pyle Bsp (solar, 0.1 MW)Solar0.1 MWnot statedConnected
Pyle Bsp (hybrid)Hybrid0 MW28 Oct 2027Accepted to Connect