N84 Grid

Radstock Bsp 132Kv

DNO substation.

Contracted here0.21 GWNot yet connected, as printed
Entries in the queue7entries with a printed MW
Earliest connection date6 Jan 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue201.06 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Radstock Bsp 132Kv (solar)16 Apr 20206 Jan 202749.9 MW
Radstock Bsp 132Kv (bess)3 Aug 20234 Mar 202710 MW
Radstock Bsp 132Kv (solar)27 Jul 202010 Jun 202710 MW
Radstock Bsp 132Kv (hybrid)18 Mar 202228 Jun 202799 MW
Radstock Bsp 132Kv (solar)4 Feb 20265 Jul 202715 MW
Radstock Bsp 132Kv (solar)22 Mar 20221 Jan 202817.16 MW
Radstock Bsp 132Kv (wind on)15 Jul 20241 May 203711.75 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW125 MW250 MW2027: 184 MW2028: 201 MW2037: 213 MW202720292031203320352037213 MW
0 MW125 MW250 MW2027: 184 MW2028: 201 MW2037: 213 MW2027203020332037213 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
2027183.9 MW
2028201.06 MW
2037212.81 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Radstock Bsp 132Kv (solar)49.9 MW0 MW6 Jan 2027not statedgate not printedAccepted to Connect
2Radstock Bsp 132Kv (bess)10 MW49.9 MW4 Mar 2027not statedgate not printedAccepted to Connect
3Radstock Bsp 132Kv (solar)10 MW59.9 MW10 Jun 2027not statedgate not printedAccepted to Connect
4Radstock Bsp 132Kv (hybrid)99 MW69.9 MW28 Jun 2027not statedgate not printedAccepted to Connect
5Radstock Bsp 132Kv (solar)15 MW168.9 MW5 Jul 2027not statedgate not printedAccepted to Connect
6Radstock Bsp 132Kv (solar)17.16 MW183.9 MW1 Jan 2028not statedgate not printedAccepted to Connect
7Radstock Bsp 132Kv (wind on)11.75 MW201.06 MW1 May 2037not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
20275183.9 MW
2028117.16 MW
2037111.75 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Radstock Bsp 132Kv (solar, 49.9 MW)Solar49.9 MW6 Jan 2027Accepted to Connect
Radstock Bsp 132Kv (hybrid, 49.5 MW)Hybrid49.5 MW28 Jun 2027Accepted to Connect
Radstock Bsp 132Kv (solar, 17.16 MW)Solar17.16 MW1 Jan 2028Accepted to Connect
Radstock Bsp 132Kv (solar, 15 MW)Solar15 MW5 Jul 2027Accepted to Connect
Radstock Bsp 132Kv (solar, 14.54 MW)Solar14.54 MWnot statedConnected
Radstock Bsp 132Kv (solar, 10 MW)Solar10 MW10 Jun 2027Accepted to Connect
Radstock Bsp 132Kv (onshore wind, 10 MW)Onshore wind10 MW1 May 2037Accepted to Connect
Radstock Bsp 132Kv (battery, 10 MW)Battery storage10 MW4 Mar 2027Accepted to Connect
Radstock Bsp 132Kv (solar, 6.05 MW)Solar6.05 MWnot statedConnected
Radstock Bsp 132Kv (solar, 4.75 MW)Solar4.75 MWnot statedConnected
Radstock Bsp 132Kv (solar, 3.71 MW)Solar3.71 MWnot statedConnected
Radstock Bsp 132Kv (solar, 3.68 MW)Solar3.68 MWnot statedConnected
Radstock Bsp 132Kv (solar, 3.2 MW)Solar3.2 MWnot statedConnected
Radstock Bsp 132Kv (solar, 2.28 MW)Solar2.28 MWnot statedConnected
Radstock Bsp 132Kv (onshore wind, 1.9 MW)Onshore wind1.9 MWnot statedConnected
Radstock Bsp 132Kv (solar, 1.9 MW)Solar1.9 MWnot statedConnected

Supported by NGED Open Data