Smethwick 132/11Kv

DNO substation.

Contracted here0.00 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date11 Nov 2026Date printed in the register

The queue, in order

Order calculated by N84
First in queue0.59 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Smethwick 132/11Kv (solar)3 Nov 202511 Nov 20260.5 MW
Smethwick 132/11Kv (solar)3 Oct 20251 Oct 20270.09 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW0 MW1 MW2026: 1 MW2027: 1 MW202620271 MW
0 MW0 MW1 MW2026: 1 MW2027: 1 MW202620271 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20260.5 MW
20270.59 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Smethwick 132/11Kv (solar)0.5 MW0 MW11 Nov 2026not statedgate not printedAccepted to Connect
2Smethwick 132/11Kv (solar)0.09 MW0.5 MW1 Oct 2027not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202610.5 MW
202710.09 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Smethwick 132/11Kv (gas, 0.95 MW)Gas0.95 MWnot statedConnected
Smethwick 132/11Kv (solar, 0.5 MW)Solar0.5 MW11 Nov 2026Accepted to Connect
Smethwick 132/11Kv (solar, 0.28 MW)Solar0.28 MWnot statedConnected
Smethwick 132/11Kv (solar, 0.28 MW)Solar0.28 MWnot statedConnected
Smethwick 132/11Kv (solar, 0.28 MW)Solar0.28 MWnot statedConnected
Smethwick 132/11Kv (solar, 0.14 MW)Solar0.14 MWnot statedConnected
Smethwick 132/11Kv (solar, 0.1 MW)Solar0.1 MWnot statedConnected
Smethwick 132/11Kv (solar, 0.09 MW)Solar0.09 MW1 Oct 2027Accepted to Connect
Smethwick 132/11Kv (solar, 0.08 MW)Solar0.08 MWnot statedConnected
Smethwick 132/11Kv (solar, 0.05 MW)Solar0.05 MWnot statedConnected

Supported by NGED Open Data