N84 Grid

St Tudy Bsp

DNO substation.

Contracted here0.04 GWNot yet connected, as printed
Entries in the queue4entries with a printed MW
Earliest connection date5 Apr 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue40.9 MW across the first 4 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
St Tudy Bsp (wind on)28 Feb 20195 Apr 20271 MW
St Tudy Bsp (wind on)11 Nov 20256 Apr 202710 MW
St Tudy Bsp (thermal)21 Dec 20237 Apr 20274.9 MW
St Tudy Bsp (wind on)25 Jan 20226 May 202725 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW25 MW50 MW2027: 41 MW202741 MW
0 MW25 MW50 MW2027: 41 MW202741 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202740.9 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1St Tudy Bsp (wind on)1 MW0 MW5 Apr 2027not statedgate not printedAccepted to Connect
2St Tudy Bsp (wind on)10 MW1 MW6 Apr 2027not statedgate not printedAccepted to Connect
3St Tudy Bsp (thermal)4.9 MW11 MW7 Apr 2027not statedgate not printedAccepted to Connect
4St Tudy Bsp (wind on)25 MW15.9 MW6 May 2027not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2027440.9 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
St Tudy Bsp (onshore wind, 25 MW)Onshore wind25 MW6 May 2027Accepted to Connect
St Tudy Bsp (onshore wind, 10 MW)Onshore wind10 MW6 Apr 2027Accepted to Connect
St Tudy Bsp (onshore wind, 9.5 MW)Onshore wind9.5 MWnot statedConnected
St Tudy Bsp (onshore wind, 8.74 MW)Onshore wind8.74 MWnot statedConnected
St Tudy Bsp (solar, 7.75 MW)Solar7.75 MWnot statedConnected
St Tudy Bsp (onshore wind, 6.84 MW)Onshore wind6.84 MWnot statedConnected
St Tudy Bsp (thermal, 4.9 MW)Thermal4.9 MW7 Apr 2027Accepted to Connect
St Tudy Bsp (solar, 4.75 MW)Solar4.75 MWnot statedConnected
St Tudy Bsp (solar, 4.18 MW)Solar4.18 MWnot statedConnected
St Tudy Bsp (solar, 3.99 MW)Solar3.99 MWnot statedConnected
St Tudy Bsp (solar, 3.62 MW)Solar3.62 MWnot statedConnected
St Tudy Bsp (solar, 2.85 MW)Solar2.85 MWnot statedConnected
St Tudy Bsp (onshore wind, 1 MW)Onshore wind1 MW5 Apr 2027Accepted to Connect
St Tudy Bsp (hybrid, 0.12 MW)Hybrid0.12 MWnot statedConnected
St Tudy Bsp (solar, 0.1 MW)Solar0.1 MWnot statedConnected
St Tudy Bsp (hydro, 0.1 MW)Hydro and pumped storage0.1 MWnot statedConnected
St Tudy Bsp (solar, 0.1 MW)Solar0.1 MWnot statedConnected
St Tudy Bsp (solar, 0.1 MW)Solar0.1 MWnot statedConnected
St Tudy Bsp (solar, 0.1 MW)Solar0.1 MWnot statedConnected
St Tudy Bsp (solar, 0.05 MW)Solar0.05 MWnot statedConnected

Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.