The queue, in order
Dates in the queue
From the earliest date we hold to the connection date printed, in queue order
- St Tudy Bsp (wind on)
28 Feb 2019 to 5 Apr 2027 (gate not printed) - St Tudy Bsp (wind on)
11 Nov 2025 to 6 Apr 2027 (gate not printed) - St Tudy Bsp (thermal)
21 Dec 2023 to 7 Apr 2027 (gate not printed) - St Tudy Bsp (wind on)
25 Jan 2022 to 6 May 2027 (gate not printed)
Table view
| Project | From | Connection date | MW |
|---|---|---|---|
| St Tudy Bsp (wind on) | 28 Feb 2019 | 5 Apr 2027 | 1 MW |
| St Tudy Bsp (wind on) | 11 Nov 2025 | 6 Apr 2027 | 10 MW |
| St Tudy Bsp (thermal) | 21 Dec 2023 | 7 Apr 2027 | 4.9 MW |
| St Tudy Bsp (wind on) | 25 Jan 2022 | 6 May 2027 | 25 MW |
Contracted MW as dates arrive
Running total by connection year, years to scale
Table view
| Year | Cumulative MW |
|---|---|
| 2027 | 40.9 MW |
Queue
| Placecalculated by N84 | Project | MW (as published) | MW ahead (N84 order) | Connection date | Gate | Order group | Status (as printed) |
|---|---|---|---|---|---|---|---|
| 1 | St Tudy Bsp (wind on) | 1 MW | 0 MW | 5 Apr 2027 | not stated | gate not printed | Accepted to Connect |
| 2 | St Tudy Bsp (wind on) | 10 MW | 1 MW | 6 Apr 2027 | not stated | gate not printed | Accepted to Connect |
| 3 | St Tudy Bsp (thermal) | 4.9 MW | 11 MW | 7 Apr 2027 | not stated | gate not printed | Accepted to Connect |
| 4 | St Tudy Bsp (wind on) | 25 MW | 15.9 MW | 6 May 2027 | not stated | gate not printed | Accepted to Connect |
Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order
| Year (MW effective from) | Projects | MW |
|---|---|---|
| 2027 | 4 | 40.9 MW |
Projects recorded at this site
| Project (as published) | Technology | MW | Connection date | Status (as printed) |
|---|---|---|---|---|
| St Tudy Bsp (onshore wind, 25 MW) | Onshore wind | 25 MW | 6 May 2027 | Accepted to Connect |
| St Tudy Bsp (onshore wind, 10 MW) | Onshore wind | 10 MW | 6 Apr 2027 | Accepted to Connect |
| St Tudy Bsp (onshore wind, 9.5 MW) | Onshore wind | 9.5 MW | not stated | Connected |
| St Tudy Bsp (onshore wind, 8.74 MW) | Onshore wind | 8.74 MW | not stated | Connected |
| St Tudy Bsp (solar, 7.75 MW) | Solar | 7.75 MW | not stated | Connected |
| St Tudy Bsp (onshore wind, 6.84 MW) | Onshore wind | 6.84 MW | not stated | Connected |
| St Tudy Bsp (thermal, 4.9 MW) | Thermal | 4.9 MW | 7 Apr 2027 | Accepted to Connect |
| St Tudy Bsp (solar, 4.75 MW) | Solar | 4.75 MW | not stated | Connected |
| St Tudy Bsp (solar, 4.18 MW) | Solar | 4.18 MW | not stated | Connected |
| St Tudy Bsp (solar, 3.99 MW) | Solar | 3.99 MW | not stated | Connected |
| St Tudy Bsp (solar, 3.62 MW) | Solar | 3.62 MW | not stated | Connected |
| St Tudy Bsp (solar, 2.85 MW) | Solar | 2.85 MW | not stated | Connected |
| St Tudy Bsp (onshore wind, 1 MW) | Onshore wind | 1 MW | 5 Apr 2027 | Accepted to Connect |
| St Tudy Bsp (hybrid, 0.12 MW) | Hybrid | 0.12 MW | not stated | Connected |
| St Tudy Bsp (solar, 0.1 MW) | Solar | 0.1 MW | not stated | Connected |
| St Tudy Bsp (hydro, 0.1 MW) | Hydro and pumped storage | 0.1 MW | not stated | Connected |
| St Tudy Bsp (solar, 0.1 MW) | Solar | 0.1 MW | not stated | Connected |
| St Tudy Bsp (solar, 0.1 MW) | Solar | 0.1 MW | not stated | Connected |
| St Tudy Bsp (solar, 0.1 MW) | Solar | 0.1 MW | not stated | Connected |
| St Tudy Bsp (solar, 0.05 MW) | Solar | 0.05 MW | not stated | Connected |