Talbot Green Primary

DNO substation.

Contracted here0.02 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date10 Sep 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue15.1 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Talbot Green Grid (solar)27 Dec 202410 Sep 20267.6 MW
Talbot Green Grid (solar)4 Aug 202329 Sep 20277.5 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW10 MW20 MW2026: 8 MW2027: 15 MW2026202715 MW
0 MW10 MW20 MW2026: 8 MW2027: 15 MW2026202715 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20267.6 MW
202715.1 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Talbot Green Grid (solar)7.6 MW0 MW10 Sep 2026not statedgate not printedAccepted to Connect
2Talbot Green Grid (solar)7.5 MW7.6 MW29 Sep 2027not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202617.6 MW
202717.5 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Talbot Green Primary (solar, 7.5 MW)Solar7.5 MW29 Sep 2027Accepted to Connect
Talbot Green Primary (solar, 7.5 MW)Solar7.5 MW10 Sep 2026Accepted to Connect
Talbot Green Primary (onshore wind, 2.38 MW)Onshore wind2.38 MWnot statedConnected
Talbot Green Primary (solar, 0.05 MW)Solar0.05 MWnot statedConnected
Talbot Green Primary (solar, 0.04 MW)Solar0.04 MWnot statedConnected

Supported by NGED Open Data