Tamworth Grid 11Kv S Stn

DNO substation.

Contracted here0.05 GWNot yet connected, as printed
Entries in the queue3entries with a printed MW
Earliest connection date30 Mar 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue50 MW across the first 3 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Tamworth Grid 11Kv S Stn (gas)2 Mar 202230 Mar 20270.5 MW
Tamworth 33Kv S Stn (hybrid)28 Nov 202428 Apr 202719.5 MW
Tamworth 33Kv S Stn (solar)20 Oct 202130 Oct 202730 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW25 MW50 MW2027: 50 MW202750 MW
0 MW25 MW50 MW2027: 50 MW202750 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202750 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Tamworth Grid 11Kv S Stn (gas)0.5 MW0 MW30 Mar 2027not statedgate not printedAccepted to Connect
2Tamworth 33Kv S Stn (hybrid)19.5 MW0.5 MW28 Apr 2027not statedgate not printedAccepted to Connect
3Tamworth 33Kv S Stn (solar)30 MW20 MW30 Oct 2027not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2027350 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Tamworth Grid 11Kv S Stn (solar, 30 MW)Solar30 MW30 Oct 2027Accepted to Connect
Tamworth Grid 11Kv S Stn (hybrid, 18.5 MW)Hybrid18.5 MW28 Apr 2027Accepted to Connect
Tamworth Grid 11Kv S Stn (solar, 13.3 MW)Solar13.3 MWnot statedConnected
Tamworth Grid 11Kv S Stn (hybrid, 2.23 MW)Hybrid2.23 MWnot statedConnected
Tamworth Grid 11Kv S Stn (gas, 0.53 MW)Gas0.53 MW30 Mar 2027Accepted to Connect
Tamworth Grid 11Kv S Stn (solar, 0.24 MW)Solar0.24 MWnot statedConnected
Tamworth Grid 11Kv S Stn (solar, 0.19 MW)Solar0.19 MWnot statedConnected
Tamworth Grid 11Kv S Stn (solar, 0.18 MW)Solar0.18 MWnot statedConnected
Tamworth Grid 11Kv S Stn (solar, 0.16 MW)Solar0.16 MWnot statedConnected
Tamworth Grid 11Kv S Stn (solar, 0.13 MW)Solar0.13 MWnot statedConnected
Tamworth Grid 11Kv S Stn (solar, 0.06 MW)Solar0.06 MWnot statedConnected
Tamworth Grid 11Kv S Stn (solar, 0.05 MW)Solar0.05 MWnot statedConnected