Contracted here0.21 GWNot yet connected, as printed
Entries in the queue8entries with a printed MW
Earliest connection date31 Dec 2026Date printed in the register

The queue, in order

Order calculated by N84
First in queue208.1 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Upper Boat Bsp (solar)28 Mar 202231 Dec 202615 MW
Upper Boat (bess)4 Feb 20221 Jan 202749.9 MW
Upper Boat Bsp (wind on)23 Sep 201920 Jan 202729.4 MW
Upper Boat Bsp (solar)9 Oct 201919 Apr 202749.9 MW
Upper Boat Bsp (solar)9 Oct 202028 Sep 202738 MW
Upper Boat Bsp (wind on)17 Nov 202031 Dec 202725.9 MW
Upper Boat Bsp (wind on)7 Feb 202230 Jun 20296 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW125 MW250 MW2026: 15 MW2027: 208 MW2029: 214 MW2026202720282029214 MW
0 MW125 MW250 MW2026: 15 MW2027: 208 MW2029: 214 MW2026202720282029214 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202615 MW
2027208.1 MW
2029214.1 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Upper Boat Bsp (solar)15 MW0 MW31 Dec 2026not statedgate not printedAccepted to Connect
2Upper Boat (bess)49.9 MW15 MW1 Jan 2027not statedgate not printedAccepted to Connect
3Upper Boat Bsp (wind on)29.4 MW64.9 MW20 Jan 2027not statedgate not printedAccepted to Connect
4Upper Boat Bsp (solar)49.9 MW94.3 MW19 Apr 2027not statedgate not printedAccepted to Connect
5Upper Boat Bsp (solar)38 MW144.2 MW28 Sep 2027not statedgate not printedAccepted to Connect
6Upper Boat Bsp (wind on)25.9 MW182.2 MW31 Dec 2027not statedgate not printedAccepted to Connect
7Upper Boat Bsp (wind on)6 MW208.1 MW30 Jun 2029not statedgate not printedAccepted to Connect
8Upper Boat Primary (solar)0.09 MW214.1 MWnot statednot statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2026115 MW
20275193.1 MW
202916 MW
not stated10.09 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Upper Boat Bsp (solar, 49.9 MW)Solar49.9 MW19 Apr 2027Accepted to Connect
Upper Boat Bsp (solar, 38 MW)Solar38 MW28 Sep 2027Accepted to Connect
Upper Boat Bsp (onshore wind, 29.4 MW)Onshore wind29.4 MW20 Jan 2027Accepted to Connect
Upper Boat Bsp (onshore wind, 25.89 MW)Onshore wind25.9 MW31 Dec 2027Accepted to Connect
Upper Boat Bsp (onshore wind, 22.8 MW)Onshore wind22.8 MWnot statedConnected
Upper Boat Bsp (gas, 19.95 MW)Gas19.95 MWnot statedConnected
Upper Boat Bsp (solar, 15 MW)Solar15 MW31 Dec 2026Accepted to Connect
Upper Boat Bsp (onshore wind, 12 MW)Onshore wind12 MWnot statedConnected
Upper Boat Bsp (onshore wind, 10.45 MW)Onshore wind10.45 MWnot statedConnected
Upper Boat Bsp (onshore wind, 9.5 MW)Onshore wind9.5 MWnot statedConnected
Upper Boat Bsp (onshore wind, 6.08 MW)Onshore wind6.08 MWnot statedConnected
Upper Boat Bsp (onshore wind, 6 MW)Onshore wind6 MW30 Jun 2029Accepted to Connect
Upper Boat Bsp (solar, 4.85 MW)Solar4.85 MWnot statedConnected
Upper Boat Bsp (solar, 3.33 MW)Solar3.33 MWnot statedConnected
Upper Boat Bsp (solar, 0.42 MW)Solar0.42 MWnot statedConnected
Upper Boat Bsp (hybrid, 0.16 MW)Hybrid0.16 MWnot statedConnected
Upper Boat Bsp (solar, 0.09 MW)Solar0.09 MWnot statedAccepted to Connect
Upper Boat Bsp (solar, 0.05 MW)Solar0.05 MWnot statedConnected
Upper Boat Bsp (gas)Gas0 MWnot statedConnected
Upper Boat Bsp (battery)Battery storage0 MW1 Jan 2027Accepted to Connect

Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.