| Project | From | Connection date | MW |
|---|---|---|---|
| Woodcote Bsp (hybrid) | 8 Jul 2022 | 27 Jan 2027 | 42 MW |
| Woodcote Bsp (solar) | 21 Sep 2021 | 1 Dec 2029 | 15 MW |
Contracted MW as dates arrive
Running total by connection year, years to scale
Table view
| Year | Cumulative MW |
|---|---|
| 2027 | 42 MW |
| 2029 | 57 MW |
Queue
| Placecalculated by N84 | Project | MW (as published) | MW ahead (N84 order) | Connection date | Gate | Order group | Status (as printed) |
|---|---|---|---|---|---|---|---|
| 1 | Woodcote Bsp (hybrid) | 42 MW | 0 MW | 27 Jan 2027 | not stated | gate not printed | Accepted to Connect |
| 2 | Woodcote Bsp (solar) | 15 MW | 42 MW | 1 Dec 2029 | not stated | gate not printed | Accepted to Connect |
Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order
| Year (MW effective from) | Projects | MW |
|---|---|---|
| 2027 | 1 | 42 MW |
| 2029 | 1 | 15 MW |
Projects recorded at this site
| Project (as published) | Technology | MW | Connection date | Status (as printed) |
|---|---|---|---|---|
| Woodcote Bsp (hybrid, 22 MW) | Hybrid | 22 MW | 27 Jan 2027 | Accepted to Connect |
| Woodcote Bsp (solar, 15.82 MW) | Solar | 15.82 MW | not stated | Connected |
| Woodcote Bsp (solar, 15 MW) | Solar | 15 MW | 1 Dec 2029 | Accepted to Connect |
| Woodcote Bsp (solar, 14.4 MW) | Solar | 14.4 MW | not stated | Connected |
| Woodcote Bsp (solar, 7.5 MW) | Solar | 7.5 MW | not stated | Connected |
| Woodcote Bsp (solar, 6.65 MW) | Solar | 6.65 MW | not stated | Connected |
| Woodcote Bsp (solar, 5.87 MW) | Solar | 5.87 MW | not stated | Connected |
| Woodcote Bsp (solar, 4.67 MW) | Solar | 4.67 MW | not stated | Connected |
| Woodcote Bsp (solar, 4.66 MW) | Solar | 4.66 MW | not stated | Connected |
| Woodcote Bsp (solar, 4.28 MW) | Solar | 4.28 MW | not stated | Connected |
| Woodcote Bsp (solar, 3.84 MW) | Solar | 3.84 MW | not stated | Connected |
| Woodcote Bsp (solar, 2.85 MW) | Solar | 2.85 MW | not stated | Connected |
| Woodcote Bsp (gas, 0.71 MW) | Gas | 0.71 MW | not stated | Connected |