ALTON LOCAL

DNO substation.

Contracted here0.00 GWNot yet connected, as printed
Entries in the queue3entries with a printed MW
Earliest connection date27 Feb 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue0.72 MW across the first 3 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
ALTON LOCAL (solar)26 Feb 202527 Feb 20260.4 MW
ALTON LOCAL (solar)4 Jan 20264 Jan 20270.02 MW
ALTON LOCAL (solar)20 Mar 202620 Mar 20270.3 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW0 MW1 MW2026: 0 MW2027: 1 MW202620271 MW
0 MW0 MW1 MW2026: 0 MW2027: 1 MW202620271 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20260.4 MW
20270.72 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1ALTON LOCAL (solar)0.4 MW0 MW27 Feb 2026not statedgate not printedAccepted to Connect
2ALTON LOCAL (solar)0.02 MW0.4 MW4 Jan 2027not statedgate not printedAccepted to Connect
3ALTON LOCAL (solar)0.3 MW0.42 MW20 Mar 2027not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202610.4 MW
202720.32 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
ALTON LOCAL (solar, 0.4 MW)Solar0.4 MW27 Feb 2026Accepted to Connect
ALTON LOCAL (solar, 0.35 MW)Solar0.24 MWnot statedConnected
ALTON LOCAL (solar, 0.02 MW)Solar0.08 MW4 Jan 2027Accepted to Connect
ALTON LOCAL (solar, 0.3 MW)Solar0 MW20 Mar 2027Accepted to Connect
ALTON LOCAL (solar, 0.12 MW)Solar0 MWnot statedAccepted to Connect
ALTON LOCAL (solar, 0.02 MW)Solar0 MW1 Apr 2027Accepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.