N84 Grid

BRACO GRID

DNO substation.

Contracted here0.05 GWNot yet connected, as printed
Entries in the queue1entry with a printed MW
Earliest connection date4 Sep 2034Date printed in the register

The queue, in order

Order calculated by N84
First in queue50 MW across the first project
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
BRACO GRID (hybrid)4 Sep 20244 Sep 203450 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW25 MW50 MW2034: 50 MW203450 MW
0 MW25 MW50 MW2034: 50 MW203450 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
203450 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1BRACO GRID (hybrid)50 MW0 MW4 Sep 2034not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2034150 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
BRACO GRID (hybrid, 50 MW)Hybrid50 MW4 Sep 2034Accepted to Connect
BRACO GRID (other, 2 MW)Other2 MWnot statedConnected
BRACO GRID (other, 0.03 MW)Other0.03 MWnot statedConnected
BRACO GRID (solar, 34.98 MW)Solar0 MWnot statedAccepted to Connect
BRACO GRID (other, 0.31 MW)Other0 MWnot statedConnected
BRACO GRID (onshore wind, 120 MW)Onshore wind0 MWnot statedAccepted to Connect
BRACO GRID (solar, 0.3 MW)Solar0 MW21 Jan 2026Accepted to Connect
BRACO GRID (battery, 51.75 MW)Battery storage0 MW31 May 2035Accepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.