N84 Grid

BRAMLEY (BASI)

DNO substation.

Contracted here0.23 GWNot yet connected, as printed
Entries in the queue4entries with a printed MW
Earliest connection date6 Apr 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue228.11 MW across the first 4 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
BRAMLEY (BASI) (solar)6 Apr 20266 Apr 20278.11 MW
BRAMLEY (BASI) (solar)16 Sep 202131 Oct 2028100 MW
BRAMLEY (BASI) (bess)13 Apr 202230 Oct 203770 MW
BRAMLEY (BASI) (other)19 Apr 202331 Oct 203750 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW125 MW250 MW2027: 8 MW2028: 108 MW2037: 228 MW202720292031203320352037228 MW
0 MW125 MW250 MW2027: 8 MW2028: 108 MW2037: 228 MW2027203020332037228 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20278.11 MW
2028108.11 MW
2037228.11 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1BRAMLEY (BASI) (solar)8.11 MW0 MW6 Apr 2027not statedgate not printedAccepted to Connect
2BRAMLEY (BASI) (solar)100 MW8.11 MW31 Oct 2028not statedgate not printedAccepted to Connect
3BRAMLEY (BASI) (bess)70 MW108.11 MW30 Oct 2037not statedgate not printedAccepted to Connect
4BRAMLEY (BASI) (other)50 MW178.11 MW31 Oct 2037not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202718.11 MW
20281100 MW
20372120 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
BRAMLEY (BASI) (solar, 100 MW)Solar100 MW31 Oct 2028Accepted to Connect
BRAMLEY (BASI) (battery, 70 MW)Battery storage70 MW30 Oct 2037Accepted to Connect
BRAMLEY (BASI) (other, 50 MW)Other50 MW31 Oct 2037Accepted to Connect
BRAMLEY (BASI) (solar, 8.11 MW)Solar8.11 MW6 Apr 2027Accepted to Connect
BRAMLEY (BASI) (other, 1.52 MW)Other0.1 MWnot statedConnected
BRAMLEY (BASI) (solar, 32.4 MW)Solar0 MWnot statedAccepted to Connect
BRAMLEY (BASI) (battery, 110 MW)Battery storage0 MWnot statedAccepted to Connect
BRAMLEY (BASI) (hybrid, 42.7 MW)Hybrid0 MWnot statedAccepted to Connect
BRAMLEY (BASI) (other, 50 MW)Other0 MWnot statedAccepted to Connect
BRAMLEY (BASI) (battery, 29.9 MW)Battery storage0 MWnot statedAccepted to Connect
BRAMLEY (BASI) (thermal, 65.32 MW)Thermal0 MWnot statedAccepted to Connect
BRAMLEY (BASI) (hybrid, 45 MW)Hybrid0 MWnot statedAccepted to Connect
BRAMLEY (BASI) (battery, 7 MW)Battery storage0 MWnot statedAccepted to Connect
BRAMLEY (BASI) (hybrid, 45 MW)Hybrid0 MWnot statedAccepted to Connect
BRAMLEY (BASI) (battery, 29.9 MW)Battery storage0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.