BRIDGE OF DON

DNO substation.

Contracted here0.00 GWNot yet connected, as printed
Entries in the queue1entry with a printed MW
Earliest connection date27 Jun 2025Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue0.1 MW across the first project
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

  • BRIDGE OF DON (solar)3 Aug 2023 to 27 Jun 2025, date already passed (gate not printed)
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
BRIDGE OF DON (solar)3 Aug 202327 Jun 20250.1 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW0 MW0 MW2025: 0 MW20250 MW
0 MW0 MW0 MW2025: 0 MW20250 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20250.1 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1BRIDGE OF DON (solar)0.1 MW0 MW27 Jun 2025not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202510.1 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
BRIDGE OF DON (biomass, 2.19 MW)Biomass and waste2.19 MWnot statedConnected
BRIDGE OF DON (biomass, 1.29 MW)Biomass and waste1.29 MWnot statedConnected
BRIDGE OF DON (other, 0.31 MW)Other0.31 MWnot statedConnected
BRIDGE OF DON (other, 0.1 MW)Other0.1 MWnot statedConnected
BRIDGE OF DON (solar, 0.13 MW)Solar0 MW31 Dec 2026Accepted to Connect
BRIDGE OF DON (solar, 1.24 MW)Solar0 MWnot statedConnected
BRIDGE OF DON (onshore wind, 1.09 MW)Onshore wind0 MWnot statedConnected
BRIDGE OF DON (solar, 1.7 MW)Solar0 MWnot statedConnected
BRIDGE OF DON (solar, 0.06 MW)Solar0 MWnot statedAccepted to Connect
BRIDGE OF DON (solar, 0.08 MW)Solar0 MW6 Mar 2027Accepted to Connect
BRIDGE OF DON (solar, 0.1 MW)Solar0 MW27 Jun 2025Accepted to Connect
BRIDGE OF DON (biomass, 0.23 MW)Biomass and waste0 MWnot statedAccepted to Connect
BRIDGE OF DON (solar, 0.18 MW)Solar0 MW6 May 2026Accepted to Connect
BRIDGE OF DON (solar, 0.08 MW)Solar0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.