N84 Grid

BRIDGE ROAD

DNO substation.

Contracted here0.12 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date11 Jun 2025Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue120.12 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
BRIDGE ROAD (solar)11 Jun 202411 Jun 20250.12 MW
BRIDGE ROAD (other)19 Jul 202431 Oct 2038120 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW100 MW200 MW2025: 0 MW2038: 120 MW2025202720292031203320352038120 MW
0 MW100 MW200 MW2025: 0 MW2038: 120 MW2025202920332038120 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20250.12 MW
2038120.12 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1BRIDGE ROAD (solar)0.12 MW0 MW11 Jun 2025not statedgate not printedAccepted to Connect
2BRIDGE ROAD (other)120 MW0.12 MW31 Oct 2038not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202510.12 MW
20381120 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
BRIDGE ROAD (other, 120 MW)Other120 MW31 Oct 2038Accepted to Connect
BRIDGE ROAD (solar, 0.12 MW)Solar0.12 MW11 Jun 2025Accepted to Connect
BRIDGE ROAD (solar, 0.14 MW)Solar0 MWnot statedAccepted to Connect
BRIDGE ROAD (gas, 0.27 MW)Gas0 MW19 Jun 2026Accepted to Connect
BRIDGE ROAD (solar, 0.09 MW)Solar0 MWnot statedAccepted to Connect
BRIDGE ROAD (gas, 0.27 MW)Gas0 MWnot statedAccepted to Connect
BRIDGE ROAD (solar, 0.1 MW)Solar0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.