The queue, in order
Dates in the queue
From the earliest date we hold to the connection date printed, in queue order
- CLACHAN GRID (hydro)
8 Jun 2023 to 30 Sep 2025, date already passed (gate not printed) - CLACHAN (wind on)
4 Oct 2023 to 31 Oct 2030 (gate not printed)
Table view
| Project | From | Connection date | MW |
|---|---|---|---|
| CLACHAN GRID (hydro) | 8 Jun 2023 | 30 Sep 2025 | 0.42 MW |
| CLACHAN (wind on) | 4 Oct 2023 | 31 Oct 2030 | 38.34 MW |
Contracted MW as dates arrive
Running total by connection year, years to scale
Table view
| Year | Cumulative MW |
|---|---|
| 2025 | 0.42 MW |
| 2030 | 38.76 MW |
Queue
| Placecalculated by N84 | Project | MW (as published) | MW ahead (N84 order) | Connection date | Gate | Order group | Status (as printed) |
|---|---|---|---|---|---|---|---|
| 1 | CLACHAN GRID (hydro) | 0.42 MW | 0 MW | 30 Sep 2025 | not stated | gate not printed | Accepted to Connect |
| 2 | CLACHAN (wind on) | 38.34 MW | 0.42 MW | 31 Oct 2030 | not stated | gate not printed | Accepted to Connect |
Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order
| Year (MW effective from) | Projects | MW |
|---|---|---|
| 2025 | 1 | 0.42 MW |
| 2030 | 1 | 38.34 MW |
Projects recorded at this site
| Project (as published) | Technology | MW | Connection date | Status (as printed) |
|---|---|---|---|---|
| CLACHAN GRID (other, 43.7 MW) | Other | 43.7 MW | not stated | Connected |
| CLACHAN GRID (onshore wind, 38.34 MW) | Onshore wind | 38.34 MW | 31 Oct 2030 | Accepted to Connect |
| CLACHAN GRID (hydro, 5.7 MW) | Hydro and pumped storage | 5.7 MW | not stated | Connected |
| CLACHAN GRID (onshore wind, 1.8 MW) | Onshore wind | 1.8 MW | not stated | Connected |
| CLACHAN GRID (other, 0.89 MW) | Other | 0.89 MW | not stated | Connected |
| CLACHAN GRID (hydro, 0.85 MW) | Hydro and pumped storage | 0.86 MW | not stated | Connected |
| CLACHAN GRID (other, 0.47 MW) | Other | 0.43 MW | not stated | Connected |
| CLACHAN GRID (hydro, 0.42 MW) | Hydro and pumped storage | 0.42 MW | 30 Sep 2025 | Accepted to Connect |
| CLACHAN GRID (hydro, 0.38 MW) | Hydro and pumped storage | 0.38 MW | not stated | Connected |
| CLACHAN GRID (hydro, 0.1 MW) | Hydro and pumped storage | 0.1 MW | not stated | Connected |