N84 Grid

COWLEY LOCAL

DNO substation.

Contracted here0.40 GWNot yet connected, as printed
Entries in the queue7entries with a printed MW
Earliest connection date30 Sep 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue284.85 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
COWLEY LOCAL (hybrid)12 Jan 202330 Sep 2026100 MW
COWLEY LOCAL (thermal)2 Dec 202612 Feb 202711.25 MW
COWLEY LOCAL (solar)10 Feb 202123 Jun 202847.5 MW
COWLEY LOCAL (solar)4 Sep 202531 Dec 20302.4 MW
COWLEY LOCAL (solar)12 Sep 20251 Jul 20314.95 MW
COWLEY LOCAL (bess)13 Nov 20241 Nov 2038118.75 MW
COWLEY LOCAL (other)5 Dec 20241 Nov 2038114.4 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW200 MW400 MW2026: 100 MW2027: 111 MW2028: 159 MW2030: 161 MW2031: 166 MW2038: 399 MW2026202820302032203420362038399 MW
0 MW200 MW400 MW2026: 100 MW2027: 111 MW2028: 159 MW2030: 161 MW2031: 166 MW2038: 399 MW2026203020342038399 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
2026100 MW
2027111.25 MW
2028158.75 MW
2030161.15 MW
2031166.1 MW
2038399.25 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1COWLEY LOCAL (hybrid)100 MW0 MW30 Sep 2026not statedgate not printedAccepted to Connect
2COWLEY LOCAL (thermal)11.25 MW100 MW12 Feb 2027not statedgate not printedAccepted to Connect
3COWLEY LOCAL (solar)47.5 MW111.25 MW23 Jun 2028not statedgate not printedAccepted to Connect
4COWLEY LOCAL (solar)2.4 MW158.75 MW31 Dec 2030not statedgate not printedAccepted to Connect
5COWLEY LOCAL (solar)4.95 MW161.15 MW1 Jul 2031not statedgate not printedAccepted to Connect
6COWLEY LOCAL (bess)118.75 MW166.1 MW1 Nov 2038not statedgate not printedAccepted to Connect
7COWLEY LOCAL (other)114.4 MW284.85 MW1 Nov 2038not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
20261100 MW
2027111.25 MW
2028147.5 MW
203012.4 MW
203114.95 MW
20382233.15 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
COWLEY LOCAL (battery, 118.75 MW)Battery storage99.9 MW1 Nov 2038Accepted to Connect
COWLEY LOCAL (other, 114.4 MW)Other99 MW1 Nov 2038Accepted to Connect
COWLEY LOCAL (hybrid, 100 MW)Hybrid50 MW30 Sep 2026Accepted to Connect
COWLEY LOCAL (solar, 47.5 MW)Solar42 MW23 Jun 2028Accepted to Connect
COWLEY LOCAL (thermal, 11.25 MW)Thermal11.25 MW12 Feb 2027Accepted to Connect
COWLEY LOCAL (solar, 2.4 MW)Solar1.9 MW31 Dec 2030Accepted to Connect
COWLEY LOCAL (other, 1.14 MW)Other0.53 MWnot statedConnected
COWLEY LOCAL (solar, 0.14 MW)Solar0.14 MWnot statedConnected
COWLEY LOCAL (solar, 0.12 MW)Solar0.12 MWnot statedConnected
COWLEY LOCAL (gas, 11.25 MW)Gas0 MW26 Sep 2030Accepted to Connect
COWLEY LOCAL (solar, 20 MW)Solar0 MW1 Oct 2027Accepted to Connect
COWLEY LOCAL (other, 300 MW)Other0 MW1 Nov 2038Accepted to Connect
COWLEY LOCAL (solar, 0.02 MW)Solar0 MWnot statedAccepted to Connect
COWLEY LOCAL (thermal, 11.25 MW)Thermal0 MW12 Feb 2027Accepted to Connect
COWLEY LOCAL (hybrid, 100 MW)Hybrid0 MWnot statedAccepted to Connect
COWLEY LOCAL (solar, 4.95 MW)Solar0 MW1 Jul 2031Accepted to Connect
COWLEY LOCAL (solar, 50 MW)Solar0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.