N84 Grid

CRAIGIEBUCKLER

DNO substation.

Contracted here0.09 GWNot yet connected, as printed
Entries in the queue3entries with a printed MW
Earliest connection date31 Aug 2025Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue91.36 MW across the first 3 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
CRAIGIEBUCKLER (solar)26 Jun 201931 Aug 20250.1 MW
CRAIGIEBUCKLER GRID (bess)16 May 202330 Aug 202748.4 MW
CRAIGIEBUCKLER GRID (bess)30 Jan 202430 Sep 203242.86 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW50 MW100 MW2025: 0 MW2027: 49 MW2032: 91 MW2025202620272028202920302031203291 MW
0 MW50 MW100 MW2025: 0 MW2027: 49 MW2032: 91 MW202520272029203291 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20250.1 MW
202748.5 MW
203291.36 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1CRAIGIEBUCKLER (solar)0.1 MW0 MW31 Aug 2025not statedgate not printedAccepted to Connect
2CRAIGIEBUCKLER GRID (bess)48.4 MW0.1 MW30 Aug 2027not statedgate not printedAccepted to Connect
3CRAIGIEBUCKLER GRID (bess)42.86 MW48.5 MW30 Sep 2032not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202510.1 MW
2027148.4 MW
2032142.86 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
CRAIGIEBUCKLER (battery, 48.4 MW)Battery storage40 MW30 Aug 2027Accepted to Connect
CRAIGIEBUCKLER (battery, 42.86 MW)Battery storage40 MW30 Sep 2032Accepted to Connect
CRAIGIEBUCKLER (other, 1.52 MW)Other0.19 MWnot statedConnected
CRAIGIEBUCKLER (solar, 0.1 MW)Solar0.1 MW31 Aug 2025Accepted to Connect
CRAIGIEBUCKLER (solar, 0.02 MW)Solar0 MWnot statedAccepted to Connect
CRAIGIEBUCKLER (solar, 0.13 MW)Solar0 MWnot statedAccepted to Connect
CRAIGIEBUCKLER (solar, 0.04 MW)Solar0 MW27 Feb 2025Accepted to Connect
CRAIGIEBUCKLER (solar, 0.32 MW)Solar0 MWnot statedAccepted to Connect
CRAIGIEBUCKLER (solar, 0.11 MW)Solar0 MWnot statedAccepted to Connect
CRAIGIEBUCKLER (other, 1.52 MW)Other0 MWnot statedConnected
CRAIGIEBUCKLER (solar, 0.11 MW)Solar0 MW15 Sep 2026Accepted to Connect
CRAIGIEBUCKLER (solar, 0.11 MW)Solar0 MWnot statedAccepted to Connect
CRAIGIEBUCKLER (solar, 0.47 MW)Solar0 MWnot statedAccepted to Connect
CRAIGIEBUCKLER (solar, 0.02 MW)Solar0 MWnot statedAccepted to Connect
CRAIGIEBUCKLER (solar, 0.93 MW)Solar0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.