N84 Grid

DEVIZES

DNO substation.

Contracted here0.02 GWNot yet connected, as printed
Entries in the queue3entries with a printed MW
Earliest connection date18 Aug 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue15.33 MW across the first 3 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

  • DEVIZES (solar)18 Aug 2025 to 18 Aug 2026, date already passed (gate not printed)
  • DEVIZES (hybrid)3 Dec 2026 to 3 Dec 2027 (gate not printed)
  • DEVIZES (other)20 Sep 2022 to 15 Nov 2037 (gate not printed)
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
DEVIZES (solar)18 Aug 202518 Aug 20260.19 MW
DEVIZES (hybrid)3 Dec 20263 Dec 20270.14 MW
DEVIZES (other)20 Sep 202215 Nov 203715 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW10 MW20 MW2026: 0 MW2027: 0 MW2037: 15 MW20262028203020322034203715 MW
0 MW10 MW20 MW2026: 0 MW2027: 0 MW2037: 15 MW2026202920322035203715 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20260.19 MW
20270.33 MW
203715.33 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1DEVIZES (solar)0.19 MW0 MW18 Aug 2026not statedgate not printedAccepted to Connect
2DEVIZES (hybrid)0.14 MW0.19 MW3 Dec 2027not statedgate not printedAccepted to Connect
3DEVIZES (other)15 MW0.33 MW15 Nov 2037not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202610.19 MW
202710.14 MW
2037115 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
DEVIZES (other, 15 MW)Other15 MW15 Nov 2037Accepted to Connect
DEVIZES (solar, 1.3 MW)Solar1.3 MWnot statedConnected
DEVIZES (other, 0.57 MW)Other0.48 MWnot statedConnected
DEVIZES (other, 0.92 MW)Other0.44 MWnot statedConnected
DEVIZES (other, 0.24 MW)Other0.24 MWnot statedConnected
DEVIZES (solar, 0.18 MW)Solar0.19 MW18 Aug 2026Accepted to Connect
DEVIZES (other, 1.19 MW)Other0.17 MWnot statedConnected
DEVIZES (other, 0.15 MW)Other0.15 MWnot statedConnected
DEVIZES (hybrid, 0.14 MW)Hybrid0.11 MW3 Dec 2027Accepted to Connect
DEVIZES (other, 0.09 MW)Other0.09 MWnot statedConnected
DEVIZES (solar, 0.17 MW)Solar0 MW21 Aug 2025Accepted to Connect
DEVIZES (other, 0.44 MW)Other0 MWnot statedConnected
DEVIZES (other, 0.48 MW)Other0 MWnot statedConnected
DEVIZES (other, 15 MW)Other0 MWnot statedAccepted to Connect
DEVIZES (hybrid, 0.14 MW)Hybrid0 MW12 Mar 2027Accepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.