The queue, in order
Dates in the queue
From the earliest date we hold to the connection date printed, in queue order
- DUNOON GRID (hydro)
11 Oct 2019 to 22 Feb 2026, date already passed (gate not printed) - DUNOON GRID (bess)
27 Apr 2022 to 31 Mar 2026, date already passed (gate not printed) - DUNOON GRID (wind on)
23 Feb 2026 to 30 Dec 2028 (gate not printed) - DUNOON GRID (wind on)
1 Feb 2022 to 30 May 2030 (gate not printed)
Table view
| Project | From | Connection date | MW |
|---|---|---|---|
| DUNOON GRID (hydro) | 11 Oct 2019 | 22 Feb 2026 | 0.45 MW |
| DUNOON GRID (bess) | 27 Apr 2022 | 31 Mar 2026 | 52.68 MW |
| DUNOON GRID (wind on) | 23 Feb 2026 | 30 Dec 2028 | 4.5 MW |
| DUNOON GRID (wind on) | 1 Feb 2022 | 30 May 2030 | 48 MW |
Contracted MW as dates arrive
Running total by connection year, years to scale
Table view
| Year | Cumulative MW |
|---|---|
| 2026 | 53.13 MW |
| 2028 | 57.63 MW |
| 2030 | 105.63 MW |
Queue
| Placecalculated by N84 | Project | MW (as published) | MW ahead (N84 order) | Connection date | Gate | Order group | Status (as printed) |
|---|---|---|---|---|---|---|---|
| 1 | DUNOON GRID (hydro) | 0.45 MW | 0 MW | 22 Feb 2026 | not stated | gate not printed | Accepted to Connect |
| 2 | DUNOON GRID (bess) | 52.68 MW | 0.45 MW | 31 Mar 2026 | not stated | gate not printed | Accepted to Connect |
| 3 | DUNOON GRID (wind on) | 4.5 MW | 53.13 MW | 30 Dec 2028 | not stated | gate not printed | Accepted to Connect |
| 4 | DUNOON GRID (wind on) | 48 MW | 57.63 MW | 30 May 2030 | not stated | gate not printed | Accepted to Connect |
Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order
| Year (MW effective from) | Projects | MW |
|---|---|---|
| 2026 | 2 | 53.13 MW |
| 2028 | 1 | 4.5 MW |
| 2030 | 1 | 48 MW |
Projects recorded at this site
| Project (as published) | Technology | MW | Connection date | Status (as printed) |
|---|---|---|---|---|
| DUNOON GRID (battery, 52.68 MW) | Battery storage | 45 MW | 31 Mar 2026 | Accepted to Connect |
| DUNOON GRID (onshore wind, 48 MW) | Onshore wind | 44 MW | 30 May 2030 | Accepted to Connect |
| DUNOON GRID (onshore wind, 27.55 MW) | Onshore wind | 27.55 MW | not stated | Connected |
| DUNOON GRID (hydro, 3.71 MW) | Hydro and pumped storage | 3.71 MW | not stated | Connected |
| DUNOON GRID (hydro, 3.71 MW) | Hydro and pumped storage | 3.71 MW | not stated | Connected |
| DUNOON GRID (hydro, 0.85 MW) | Hydro and pumped storage | 0.86 MW | not stated | Connected |
| DUNOON GRID (onshore wind, 4.5 MW) | Onshore wind | 0.5 MW | 30 Dec 2028 | Accepted to Connect |
| DUNOON GRID (hydro, 0.45 MW) | Hydro and pumped storage | 0.45 MW | 22 Feb 2026 | Accepted to Connect |
| DUNOON GRID (hydro, 0.28 MW) | Hydro and pumped storage | 0.28 MW | not stated | Connected |
| DUNOON GRID (hydro, 0.13 MW) | Hydro and pumped storage | 0.13 MW | not stated | Connected |
| DUNOON GRID (hydro, 0.1 MW) | Hydro and pumped storage | 0.1 MW | not stated | Connected |
| DUNOON GRID (battery, 71.03 MW) | Battery storage | 0 MW | not stated | Accepted to Connect |
| DUNOON GRID (hydro, 0.49 MW) | Hydro and pumped storage | 0 MW | not stated | Accepted to Connect |
Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.