N84 Grid

HILTON

DNO substation.

Contracted here0.00 GWNot yet connected, as printed
Entries in the queue4entries with a printed MW
Earliest connection date10 Apr 2025Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue0.82 MW across the first 4 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

  • HILTON (solar)10 Apr 2024 to 10 Apr 2025, date already passed (gate not printed)
  • HILTON (solar)4 Feb 2025 to 4 Feb 2026, date already passed (gate not printed)
  • HILTON (solar)9 May 2025 to 9 May 2026, date already passed (gate not printed)
  • HILTON (solar)15 May 2026 to 15 May 2027 (gate not printed)
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
HILTON (solar)10 Apr 202410 Apr 20250.01 MW
HILTON (solar)4 Feb 20254 Feb 20260.41 MW
HILTON (solar)9 May 20259 May 20260.05 MW
HILTON (solar)15 May 202615 May 20270.35 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW1 MW1 MW2025: 0 MW2026: 0 MW2027: 1 MW2025202620271 MW
0 MW1 MW1 MW2025: 0 MW2026: 0 MW2027: 1 MW2025202620271 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20250.01 MW
20260.47 MW
20270.82 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1HILTON (solar)0.01 MW0 MW10 Apr 2025not statedgate not printedAccepted to Connect
2HILTON (solar)0.41 MW0.01 MW4 Feb 2026not statedgate not printedAccepted to Connect
3HILTON (solar)0.05 MW0.42 MW9 May 2026not statedgate not printedAccepted to Connect
4HILTON (solar)0.35 MW0.47 MW15 May 2027not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202510.01 MW
202620.46 MW
202710.35 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
HILTON (solar, 0.41 MW)Solar0.41 MW4 Feb 2026Accepted to Connect
HILTON (solar, 0.35 MW)Solar0.35 MW15 May 2027Accepted to Connect
HILTON (solar, 0.05 MW)Solar0.05 MW9 May 2026Accepted to Connect
HILTON (solar, 0.01 MW)Solar0.01 MW10 Apr 2025Accepted to Connect
HILTON (solar, 0.27 MW)Solar0 MWnot statedAccepted to Connect
HILTON (solar, 0.27 MW)Solar0 MW31 Mar 2026Accepted to Connect
HILTON (solar, 0.22 MW)Solar0 MW8 May 2026Accepted to Connect
HILTON (solar, 0.06 MW)Solar0 MWnot statedAccepted to Connect
HILTON (solar, 0.01 MW)Solar0 MWnot statedAccepted to Connect
HILTON (solar, 0.06 MW)Solar0 MWnot statedAccepted to Connect
HILTON (solar, 0.22 MW)Solar0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.