KILLIN GRID

DNO substation.

Contracted here0.10 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date30 Mar 2029Date printed in the register

The queue, in order

Order calculated by N84
First in queue97.4 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
KILLIN GRID (bess)8 Oct 202530 Mar 202949.4 MW
KILLIN GRID (bess)11 May 202331 Oct 203148 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW50 MW100 MW2029: 49 MW2031: 97 MW20292030203197 MW
0 MW50 MW100 MW2029: 49 MW2031: 97 MW20292030203197 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202949.4 MW
203197.4 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1KILLIN GRID (bess)49.4 MW0 MW30 Mar 2029not statedgate not printedAccepted to Connect
2KILLIN GRID (bess)48 MW49.4 MW31 Oct 2031not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2029149.4 MW
2031148 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
KILLIN GRID (battery, 49.4 MW)Battery storage49.4 MW30 Mar 2029Accepted to Connect
KILLIN GRID (battery, 48 MW)Battery storage43 MW31 Oct 2031Accepted to Connect
KILLIN GRID (hydro, 1.9 MW)Hydro and pumped storage1.9 MWnot statedConnected
KILLIN GRID (hydro, 1.2 MW)Hydro and pumped storage1.2 MWnot statedConnected
KILLIN GRID (hydro, 1.14 MW)Hydro and pumped storage1.14 MWnot statedConnected
KILLIN GRID (hydro, 0.81 MW)Hydro and pumped storage0.81 MWnot statedConnected
KILLIN GRID (hydro, 0.81 MW)Hydro and pumped storage0.81 MWnot statedConnected
KILLIN GRID (other, 0.81 MW)Other0.81 MWnot statedConnected
KILLIN GRID (hydro, 0.71 MW)Hydro and pumped storage0.71 MWnot statedConnected
KILLIN GRID (hydro, 0.57 MW)Hydro and pumped storage0.57 MWnot statedConnected
KILLIN GRID (other, 0.47 MW)Other0.48 MWnot statedConnected
KILLIN GRID (other, 0.47 MW)Other0.48 MWnot statedConnected
KILLIN GRID (other, 0.47 MW)Other0.48 MWnot statedConnected
KILLIN GRID (other, 0.47 MW)Other0.48 MWnot statedConnected
KILLIN GRID (hydro, 0.43 MW)Hydro and pumped storage0.43 MWnot statedConnected
KILLIN GRID (other, 0.1 MW)Other0.1 MWnot statedConnected
KILLIN GRID (hydro, 0.1 MW)Hydro and pumped storage0.1 MWnot statedConnected
KILLIN GRID (hydro, 0.1 MW)Hydro and pumped storage0.1 MWnot statedConnected
KILLIN GRID (other, 0.1 MW)Other0.1 MWnot statedConnected
KILLIN GRID (hydro, 0.06 MW)Hydro and pumped storage0.06 MWnot statedConnected
KILLIN GRID (battery, 0 MW)Battery storage0 MW8 Jul 2025Accepted to Connect
KILLIN GRID (battery, 49.4 MW)Battery storage0 MWnot statedAccepted to Connect
KILLIN GRID (battery, 48 MW)Battery storage0 MWnot statedAccepted to Connect
KILLIN GRID (biomass, 5.32 MW)Biomass and waste0 MWnot statedConnected
KILLIN GRID (other, 0.09 MW)Other0 MWnot statedAccepted to Connect
KILLIN GRID (battery, 49.4 MW)Battery storage0 MWnot statedAccepted to Connect
KILLIN GRID (other, 0.09 MW)Other0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.