LAIRG GRID

DNO substation.

Contracted here0.14 GWNot yet connected, as printed
Entries in the queue4entries with a printed MW
Earliest connection date19 Dec 2029Date printed in the register

The queue, in order

Order calculated by N84
First in queue137.85 MW across the first 4 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
LAIRG GRID (wind on)29 Jul 202519 Dec 202935 MW
LAIRG GRID (bess)24 Jul 202331 Oct 203350 MW
LAIRG GRID (bess)3 Jan 202531 Oct 203352.68 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW100 MW200 MW2029: 35 MW2033: 138 MW20292030203120322033138 MW
0 MW100 MW200 MW2029: 35 MW2033: 138 MW202920312033138 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202935 MW
2033137.68 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1LAIRG GRID (wind on)35 MW0 MW19 Dec 2029not statedgate not printedAccepted to Connect
2LAIRG GRID (bess)50 MW35 MW31 Oct 2033not statedgate not printedAccepted to Connect
3LAIRG GRID (bess)52.68 MW85 MW31 Oct 2033not statedgate not printedAccepted to Connect
4LAIRG GRID (solar)0.17 MW137.68 MWnot statednot statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2029135 MW
20332102.68 MW
not stated10.17 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
LAIRG GRID (battery, 52.68 MW)Battery storage49.9 MW31 Oct 2033Accepted to Connect
LAIRG GRID (battery, 50 MW)Battery storage49.9 MW31 Oct 2033Accepted to Connect
LAIRG GRID (onshore wind, 49.88 MW)Onshore wind49.88 MWnot statedConnected
LAIRG GRID (onshore wind, 35 MW)Onshore wind35 MW19 Dec 2029Accepted to Connect
LAIRG GRID (onshore wind, 4.75 MW)Onshore wind4.75 MWnot statedConnected
LAIRG GRID (onshore wind, 3.52 MW)Onshore wind3.52 MWnot statedConnected
LAIRG GRID (solar, 0.17 MW)Solar0.17 MWnot statedAccepted to Connect
LAIRG GRID (other, 0.1 MW)Other0.1 MWnot statedConnected
LAIRG GRID (battery, 52.68 MW)Battery storage0 MWnot statedAccepted to Connect
LAIRG GRID (solar, 0.02 MW)Solar0 MWnot statedAccepted to Connect
LAIRG GRID (onshore wind, 1 MW)Onshore wind0 MWnot statedConnected
LAIRG GRID (battery, 52.68 MW)Battery storage0 MWnot statedAccepted to Connect
LAIRG GRID (battery, 50 MW)Battery storage0 MWnot statedAccepted to Connect
LAIRG GRID (onshore wind, 34.8 MW)Onshore wind0 MW19 Dec 2029Accepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.